<strong>20</strong>09 Bridge Study Strategic Vision : Scenario 4Low Load Growth• Scenario 4 — Low load growth• Flat load growth• Upper Midwest (MN, WI, IA, ND, SD) alldevelop an obligation similar to the MNRES• States outside the Upper Midwest alsoexpand on or initiate their presentrenewable obligations• <strong>Transmission</strong> similar to Scenario 2 dueto the similar regional renewableexpansion• Statistics• 1,<strong>10</strong>0 miles of 345 kV double circuit• 1<strong>10</strong> miles of 500 kV• 570 miles of 765 kV• Total Estimated Cost of: ~ $6 billion