RGOS (MISO) Study Scope• Develop regional transmission system to supportrenewable portfolio standards• Phase I – Minnesota, Wisconsin, Illinois, and Iowa(approximately 15,000 MW)• Phase II – RPS increases in Phase I states andremaining MISO states not in Phase I (approximately22,000 MW)• www.midwestiso.org/page/Expansion+<strong>Plan</strong>ning