Proposed <strong>Transmission</strong> ProjectsZone 7: North Dakota Area (<strong>20</strong>15-<strong>20</strong>19)# Project Comments Drivers1 Maple River –Cass County345kVextension2 Cass County– Red River115kV3 Maple River –Cass County– Flint 230kVExtend Maple River –Cass County 345 kVLine to FlintSubstation (viadouble-circuit withMaple River –Sheyenne 230 kV line)Cass County to RedRiver 115kV, upgradeto 795 ACSSMaple River – CassCounty – Flint 230 kVline, convert to 345 kVReliabilityReliabilityReliabilityNote: Project scope and timing subject to change