<strong>20</strong>09 Bridge Study Strategic Vision : Scenario 2Sub-Regional Renewable• Scenario 2-- Sub-Regional renewabledevelopment• Normal load growth• Upper Midwest (MN, WI, IA, ND, SD) alldevelop an obligation similar to the MNRES• States outside the Upper Midwest alsoexpand on or initiate their presentrenewable obligations• Statistics• 1,<strong>20</strong>0 miles of 345 kV double circuit• 1<strong>10</strong> miles of 500 kV• 730 miles of 765 kV– Total estimated cost of: ~$6.7billion