Environmental Impact Assessment Study for <strong>400</strong> <strong>kV</strong> OHL SS Stip – Macedonian-Serbian BorderOperational phaseRegarding the operational phase, impacts on the transmission line on the geologicalstructures and soil, hydrogeological and engineering appearances and geologicalphenomena, and processes are not expected, except in periods of maintenance andservicing of the transmission line, when the risks of disruption and erosion, as well as indirectand direct contamination of soils and rock masses, through vertical infiltration of fuel, oil orchemicals, again become current.107