12.07.2015 Views

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Environmental Impact Assessment Study for <strong>400</strong> <strong>kV</strong> OHL SS Stip – Macedonian-Serbian BorderOperational phaseDuring its operation, the transmission line will create waste that will result from the activitiesof MEPSO regarding the maintenance and control of the installation.Common types of waste that will be created in the operational phase of the project includeconsumables, spare parts and equipment. The dynamics of the creation of these wastes is inrelation to the of maintenance regime and in accordance with the requirements of themanufacturer of the transmission line and accompanying technology.The waste management system shall be established during the operational stage. Thissystem will be in compliance with the legal waste requirements and in line with MEPSO’sinternal practices for maintenance of overhead transmission lines.113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!