12.07.2015 Views

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Environmental Impact Assessment Study for <strong>400</strong> <strong>kV</strong> OHL SS Stip – Macedonian-Serbian Border1 Alternatives Concerned1.1 IntroductionThe overhead <strong>400</strong> <strong>kV</strong> transmission line for connecting the power grids of the Republic ofMacedonia and the Republic of Serbia will significantly improve the quality and flexibility ofthe power supply in the region. This cross-border connection will improve the conditions for asafe and secure transfer of greater power potential between the two countries. Theconstruction and future operation of this transmission line between Macedonia and Serbia, incombination with implementation of projects for the new <strong>400</strong> <strong>kV</strong> transmission lines to Greece(Bitola – Florina) and to Bulgaria (Stip-Chervena Mogila) will strengthen the entire capacity ofthe power system corridor North-South.During the preparatory phase of the project, MEPSO prepared several pre-feasibility studiesand feasibility studies about the interconnection <strong>400</strong> <strong>kV</strong> transmission, including a study forselecting the most optimal route thereof. 1 [Ref. 7]. Summary of reveiwed alternative variantsfor selection of optimal corridor for the route of the transmission line is presented in thefollowing picture.Picture – Alternatives for the route of the <strong>400</strong> <strong>kV</strong> interconnection transmission line Macedonia-Serbia<strong>400</strong> <strong>kV</strong> Д В ТС Ш ти п - М акедо нско -С рпска грани ц аII варијантаI вари ја нтаLegend:• Alternative I -• Alternative II -ТС <strong>400</strong>/110 <strong>kV</strong> ШтипSource: MEPSO1 Report: “Selection of optimal corridor for the route of the <strong>400</strong> <strong>kV</strong> interconnection transmission lineSS Stip – Macedonian-Serbian border”, MEPSO, October 200835

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!