12.07.2015 Views

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

Part A - EIA 400 kV OHTL Stp - мепсо а.д.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Environmental Impact Assessment Study for <strong>400</strong> <strong>kV</strong> OHL SS Stip – Macedonian-Serbian BorderEnvironmentalindicatorAir qualityWaste managementMitigation measuredesignImplementationconstructionsite preparationphaseMinimizing the open excavation areas √ √Minimizing the stockpiling by proper coordination of earthworks and excavation activities (excavation, extension,√ √grading, compacting, etc.)Reducing the fugitive dust emission by applying watersprinkling measures√ √Temporary termination / restriction of construction work ifintensive fugitive dust emission occurs, while elimination√ √measures are put in placeReducing the traffic intensity on selected roads andintroducing speed limit measures√ √As much as possible, remain existing vegetation aroundand on the construction site√ √Implementing phased measures for remediation of theconstruction site, in parallel with progress of construction√ √activitiesPackaging waste, municipal waste and constructionwaste:• Selection of those factions which are of market interest /recycling√ √• Collection of mixed waste• Transportation, processing and disposal - licensedservice providersSelection / recycling of packaging waste, waste fromtransmission line elements and materialsSeparation of the hazardous fractions of waste anddisposal√operationalphase√√138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!