13.07.2015 Views

KR 300-2 PA, KR 470-2 PA - KUKA Robotics

KR 300-2 PA, KR 470-2 PA - KUKA Robotics

KR 300-2 PA, KR 470-2 PA - KUKA Robotics

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>KR</strong> <strong>300</strong>-2 <strong>PA</strong>, <strong>KR</strong> <strong>470</strong>-2 <strong>PA</strong>5.5.3 Start-up and recommissioningBefore starting up systems and devices for the first time, a check must be carriedout to ensure that the systems and devices are complete and operational,that they can be operated safely and that any damage is detected.The valid national or regional work safety regulations must be observed for thischeck. The correct functioning of all safety circuits must also be tested.The passwords for logging onto the <strong>KUKA</strong> System Software as “Expert”and “Administrator” must be changed before start-up and mustonly be communicated to authorized personnel.The robot controller is preconfigured for the specific industrial robot.If cables are interchanged, the manipulator and the external axes (optional)may receive incorrect data and can thus cause personal injuryor material damage. If a system consists of more than one manipulator, alwaysconnect the connecting cables to the manipulators and their correspondingrobot controllers.If additional components (e.g. cables), which are not part of the scopeof supply of <strong>KUKA</strong> Roboter GmbH, are integrated into the industrialrobot, the user is responsible for ensuring that these components donot adversely affect or disable safety functions.If the internal cabinet temperature of the robot controllerdiffers greatly from the ambient temperature, condensationcan form, which may cause damage to the electrical components. Do notput the robot controller into operation until the internal temperature of thecabinet has adjusted to the ambient temperature.Function testMachine dataThe following tests must be carried out before start-up and recommissioning:It must be ensured that:• The industrial robot is correctly installed and fastened in accordance withthe specifications in the documentation.• There are no foreign bodies or loose parts on the industrial robot.• All required safety equipment is correctly installed and operational.• The power supply ratings of the industrial robot correspond to the localsupply voltage and mains type.• The ground conductor and the equipotential bonding cable are sufficientlyrated and correctly connected.• The connecting cables are correctly connected and the connectors arelocked.It must be ensured that the rating plate on the robot controller has the samemachine data as those entered in the declaration of incorporation. The machinedata on the rating plate of the manipulator and the external axes (optional)must be entered during start-up.The industrial robot must not be moved if incorrect machinedata are loaded. Death, severe injuries or considerabledamage to property may otherwise result. The correct machine datamust be loaded.44 / 73 Issued: 20.06.2013 Version: Spez <strong>KR</strong> <strong>300</strong> <strong>470</strong>-2 <strong>PA</strong> V4 en (PDF)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!