InstallationInstalling the columnsFixing and assembling■ fi t the fi rst column■ fix it to the floor using three M10 bolts having first checked itsvertical position and support■ bring the second column up beside the fi rst one■ adjust the position <strong>of</strong> the associated column (wedging at theright height, alignment <strong>of</strong> front panels)■ assemble the columns with one another:❑ 4 coupling kits, ref. 87171 on the top <strong>of</strong> frameworks❑ 2 M10 bolts on the plinths❑ 2 holding plates, ref. 87170 on the frameworks in the middlepart. These plates are clipped on forcibly and are held in placeby diameter 6 plastic rivets.Position <strong>of</strong> rivets with respect to the bottom <strong>of</strong> the top crossmember:- for a column H = 2350mm: 1294 mm- for a column H = 2200mm: 1219 mmIf plate <strong>installation</strong> causes problems, they can be replaced bycoupling kits, ref. 87171.■ identify the routing <strong>of</strong> strands or auxiliary wiring between columns.Take all necessary measures to avoid jamming or deterioration<strong>of</strong> wires when installing the columns■ protect the auxiliary wiring when it is routed near sharp edgesby means <strong>of</strong> sheaths or grommets.coupling kit ref. 87171 holding plate ref. 87170■ install all associated columns in the same waycompulsory binding by coupling kit ref. 87171compulsory binding by holding plate ref. 87170M10 bolt21OkkenSchneider Electric