13.07.2015 Views

Example of installation & commissioning guide

Example of installation & commissioning guide

Example of installation & commissioning guide

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Equipment receivingHandlingGeneralFinal unpacking <strong>of</strong> the equipment will preferably take placejust before the switchboard is installed, as close as possibleto its final <strong>installation</strong> site.The dimensions, weight and handling instructions for thecolumns are marked on the packing.As a <strong>guide</strong>line, the average weight <strong>of</strong> a column is 650 kg butthe 6300A columns (L=1150, D=1400) can weight from1500 kg to 2000 kg)Sections should always be handled in the upright position withcare. There is a risk <strong>of</strong> toppling <strong>of</strong> the column due to the highposition <strong>of</strong> the centre <strong>of</strong> gravity.Avoid any column movement by making them swivel jerkily.Handling by the bottomThe columns are designed with a built-in plinth and can bemoved by the front or the rear using a pallet truck or a adapedfork-lift truck.In this case, the columns must be lifted with care and heldin place during transport, either manually or by strappingthem onto the handling machine, if movement is over largedistances or bumpy.7OkkenSchneider Electric

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!