13.07.2015 Views

Example of installation & commissioning guide

Example of installation & commissioning guide

Example of installation & commissioning guide

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

InstallationElectrical connectionsLinking the protectiveconductorsThe earthing bars <strong>of</strong> the various sections are connectedtogether using M10 class 8.8 nuts and bolts equipped withcontact washers❑ set the bolts❑ tighten the nuts at the required torque (50 N.m) using atorque wrench❑ mark each nut with a drop <strong>of</strong> varnishEquipment protectionShould the connection not be performed immediately after<strong>installation</strong>, the following precautions will prevent any dust orforeign material penetration:❑ close all the doors❑ reassemble the side and rear panels❑ reassemble the ro<strong>of</strong>s and top and bottom ventilation grids❑ plug in the circuit-breakers and drawers❑ seal temporary openings (cable entries)❑ in case <strong>of</strong> woks involving water drops or splashing (cement,welding...), it is necessary to put a cover on the switchboards.24 Okken Schneider Electric

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!