CommissioningFU up to 630ADrawers■ racking❑ seize the drawer by the handles❑ press and hold the red release button❑ push the drawer fully home to the «connected» position❑ the racking is correct if the positioning mechanism is lockednotes:1 it is possible to go directly to the «connected» positionwhen putting the drawer into position2 the drawers equal or more than 12 modules need a moreimportant stress on racking. Curtly impart a firm motion <strong>of</strong>wrists at full stroke.disconnected positionconnected positiontest position■ operation❑ when the drawer is in the «test» or «connected» position,actuate the apparatus rotary handles or the control devices(push-buttons, selector switches) according to the electricaldiagram❑ rotary handle on Compact or GV:- turn clockwise toward «ON» to close- turn counter-clockwise toward «OFF» to open- marks placed on the rotary handle indicate the position:white / ON: closedgreen / OFF: opentripped: fault.■ check that greasing <strong>of</strong> functianal units clamps is effective43OkkenSchneider Electric

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!