Example of installation & commissioning guide
Example of installation & commissioning guide
Example of installation & commissioning guide
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GeneralIntroductionIntroductionOkken is a switchboard made up <strong>of</strong> a number <strong>of</strong> modular sections. Such a design facilitates transportation,<strong>installation</strong> and maintenance.The horizontal busbars are connected between sections by splicing.Prior to shipping, every Okken switchboard has been submittedto the 3 routine tests, as per IEC 60439-1 (wiring and electrical working, protective measures and insulation) and inspected visually, mechanically and electrically by a trained technician <strong>of</strong> the Quality Inspection department.Safety recommendationsCorrect operation <strong>of</strong> Okken switchboards requires that handling,<strong>installation</strong> and operation be carried out exclusively by qualifiedpersonnel: ❑ qualified to work near live equipment❑ trained to all applicable safety practices.During the <strong>installation</strong> and connecting operations, theswitchboard must be de-energised so as not to exposepersonnel to electric shock hazards.Failure to comply with these instructions and with thoserecalled in this <strong>guide</strong> may result in very serious or evenfatal accidents <strong>of</strong> operators or in damage to the switchboard.5OkkenSchneider Electric