Example of installation & commissioning guide
Example of installation & commissioning guide
Example of installation & commissioning guide
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CommissioningFU up to 630ADrawersAdjustmentsThe front face <strong>of</strong> the drawer is swivelling and gives access tothe devices adjustments.❑ introduce a tool inside the left handle, press moderately inorder to compress the leaf spring A and open the front panelusing the red release button❑ in the case <strong>of</strong> a drawer higher than 6 modules, remove thescrew on the front panel❑ open the door❑ carry out the adjustments❑ close again the gate. The spring goes back automaticallyin position.note:When the apparatus is closed, the voluntary opening <strong>of</strong> thedoor is possible if the «door closed locking» mechanism <strong>of</strong>rotary handle has been inhibited or removed.44 Okken Schneider Electric