13.07.2015 Views

SHAKAERATOR - Operator Manual - McConnel

SHAKAERATOR - Operator Manual - McConnel

SHAKAERATOR - Operator Manual - McConnel

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tine SpacingThe tine spacing is related to the working depth for each type of point. With the narrowpoints the spacing should be 1.2 - 1.5 times the depth. This gives the least draughtforce and most even surface finish (Fig.5) with complete break up of the soil profile.Figure 6 shows the same tines too far apart giving incomplete break up. With the widepoints the spacing can be 2 - 2.2 times the working depth (Fig.7).Shallow Leading TinesDraught force can be reduced and the amount of soil loosened increased by usingshallow tines in front of long ones. The 460mm shanks should be mounted to each sideof the 610mm shank and not directly in front. Figure 8 shows an ideal setup.16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!