13.07.2015 Views

SHAKAERATOR - Operator Manual - McConnel

SHAKAERATOR - Operator Manual - McConnel

SHAKAERATOR - Operator Manual - McConnel

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AUXILIARY EQUIPMENTTrailed ImplementsAttachments that can be fitted behind the Shakaerator such as the roller do not requirehydraulic linkage. The depth control wheels are removed and the ratchet adjusters areused on the trailed implement to control depth.When coupling the tractor to the Shakaerator use the lowest practicable hitch point, andwhere possible, turn the mounting bracket over to achieve this. Use the highest possiblehitch point for the top link mounting. Forces applied through the top link are reducedwhen operated in this way and the risk of top link failure is minimised.Where it is not possible to obtain the geometry with the tractor's existing top link, a<strong>McConnel</strong> Heavy Duty Top Link Assembly (Part Number 7115275) is available. Closedlength (pin centres) 800mm (2’ 7½”) open length 1150mm (3’ 8½”).If there is ever any doubt of the strength or serviceability of the tractor's top link, then a<strong>McConnel</strong> top link should be used. Any failure of the top link could result in seriousdamage to the through-drive assembly.OperationTo correctly set the machine for use the roller should be raised – the Shakaerator is thendrawn forward into the ground. When the points have reached the required depth the rollershould be lowered to the ground.18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!