13.07.2015 Views

Operation Manual - Critical Power Supplies

Operation Manual - Critical Power Supplies

Operation Manual - Critical Power Supplies

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INSTALLATIONALL THE OPERATIONS DESCRIBED IN THIS SECTION ARE TO BE PERFORMED EXCLUSIVELY BYQUALIFIED STAFF.The company declines all liability for damage caused by incorrect connections or operations not describedin this manual.STORING THE UPS AND THE BATTERY BOXThe storage room must respect the following conditions:Temperature:0°÷40°C (32°÷104°F)Relative humidity: max. 95%PREPARING FOR INSTALLATIONPRELIMINARY INFORMATIONUPS models 10 kVA 12 kVA 15 kVA 20 kVARated power 10000 VA 12000 VA 15000 VA 20000 VAWorking temperature 0 ÷ 40 °CMax. relative humidity during operationMax. height of installation90 % (non-condensing)1000 m at rated power(-1% <strong>Power</strong> for every 100 m above 1000 m)max 4000 mW x D x HWeight (w/ batteries)MCT320 x 840 x 930 mmMST440 x 850 x 1320 mmMCT 180 Kg 182 Kg 190 Kg 195 KgMST 305 Kg 310 Kg 315 Kg 320 Kg<strong>Power</strong> dissipated at rated resistive load(pf=0.9) and with battery as buffer *0.63 kW540 kcal/h2150 B.T.U./h0.75 kW645 kcal/h2560 B.T.U./h0.86 kW740 kcal/h2940 B.T.U./h1.15 kW990 kcal/h3930 B.T.U./h<strong>Power</strong> dissipated at rated distortion load(pf=0.7) and with battery charged *0.49 kW420 kcal/h1670 B.T.U./h0.58 kW500 kcal/h1980 B.T.U./h0.67 kW580 kcal/h2290 B.T.U./h0.90 kW775 kcal/h3070 B.T.U./hFlow rate of fans for removing heat frominstallation room **Current leak to earth ***Isolation protectionCable input340 mc/h 400 mc/h 460 mc/h 615 mc/h< 5 mAIP20From bottom / on rear* 3.97 B.T.U./h = 1 kcal/h** To calculate the air flow rate, the following formula may be used: Q [m3/h] = 3.1 x P diss [Kcal/h] / (t a - t e ) [°C]P diss is the power expressed in Kcal/h dissipated by all the devices installed in the installation environment.ta= ambient temperature, te=outside temperature. To take leaks into account, the value obtained should be increased by10%.The table shows an example of a flow rate with (t a - t e )=5°C and a rated resistive load (pf=0.9).(Note: This formula is applicable if ta>te, only; if not the UPS installation requires an air-conditioning system).*** The leakage current of the load is to be added to that of the UPS on the earth wire.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!