13.07.2015 Views

Annual Report for 2010/11 and Forward Programme - Sellafield Ltd

Annual Report for 2010/11 and Forward Programme - Sellafield Ltd

Annual Report for 2010/11 and Forward Programme - Sellafield Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SSEM/20<strong>11</strong>/4730 June 20<strong>11</strong><strong>and</strong> photo/video surveying. Constraints on the availability of EA resources <strong>and</strong> costs hasmeant that this additional work will not be delivered at this time.Figure 7.6. Target area <strong>for</strong> the grab sampling work showing the position of the sea pipelines<strong>and</strong> the location of the Aquadopp current profiler deployed to the north of the diffusers fromJune <strong>2010</strong> to February 20<strong>11</strong>7.3.4 Developing the <strong>for</strong>ward programme <strong>for</strong> offshore monitoringSection 3.3 describes the work done during <strong>2010</strong>/<strong>11</strong> <strong>and</strong> discusses the collapse of theparticle transport <strong>and</strong> dispersion modelling contract with Westlakes Scientific Consulting(WSC). The main aim of the contract with WSC was the development of an improved modelthat would in<strong>for</strong>m offshore monitoring ef<strong>for</strong>t. This model was to be used to develop thespecification <strong>for</strong> an offshore monitoring contract. The failure of the contract to deliver this hasmeant that SL is now looking to award a monitoring contract without the benefit of a validatedmodel. The specification <strong>for</strong> this contract will there<strong>for</strong>e need to be different to that previouslyplanned.Although the contract with WSC did not deliver the full work scope, the progress made priorto the collapse of the contract has provided useful in<strong>for</strong>mation on which to develop amonitoring specification. Discussions with the DSRL contractor (L<strong>and</strong> & Marine) have alsoproved very useful in underst<strong>and</strong>ing what in<strong>for</strong>mation the monitoring contractor may need togather be<strong>for</strong>e committing to a monitoring programme. SL is now looking to develop a© Nuclear Decommissioning Authority 20<strong>11</strong>. 109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!