13.07.2015 Views

Annual Report for 2010/11 and Forward Programme - Sellafield Ltd

Annual Report for 2010/11 and Forward Programme - Sellafield Ltd

Annual Report for 2010/11 and Forward Programme - Sellafield Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Commercial operator – a number of commercial operators exist that have thecapability to undertake a bespoke swath bathymetry survey of the area. Prices willvary depending on the scope of the project <strong>and</strong> the risks involved. For instance, thest<strong>and</strong>ing charges (mobilisation/demobilisation) start to become less significant <strong>for</strong> asurvey that will take several weeks to complete. The main risk is the down time dueto poor weather conditions.Invest in Eagle – The <strong>Sellafield</strong>-owned <strong>and</strong> operated vessel “Eagle” is capable ofhaving a swath bathymetry system installed. An initial assessment shows that,amongst others, a WASSP swath system (~£40-£50k) (www.wassp.com) orGeoSwath Plus system (~£150k) (www.km.kongsberg.com/geoacoustics) would besuitable <strong>for</strong> undertaking these surveys. The crew would need to be trained in theoperation of the instruments <strong>and</strong> processing of the data, with Cefas providing qualitycontrol support. A major benefit of this approach is that the Eagle <strong>and</strong> crew arealready funded <strong>and</strong> the vessel can be mobilised quickly if a weather window is<strong>for</strong>ecast, <strong>and</strong> the vessel is not required <strong>for</strong> other operations.In summary, three options are proposed in order to acquire the bathymetry in<strong>for</strong>mation.Table 1 shows these options with potential advantages/disadvantages <strong>and</strong> costs. Whilstthese are initial estimates they can help in<strong>for</strong>m the decision making process.Table 1 – Potential options <strong>for</strong> completion of Swath Survey.Option Proposal Rough Cost Advantages Disadvantages1 ExtendEnvironmentAgency surveyTBCVesselalreadyequippedNeed to ensure highquality of the survey toenable bed <strong>for</strong>mcharacterisation.[The <strong>2010</strong> survey hasbeen completed]2 Commercialsurvey£30k-£50k 13 Update Eagle WASSP(~£50k)GeoSwathPlus*(~£150k)High levels ofQualitycontrol. Fast.Uses existingship.*Industryst<strong>and</strong>ardequipmentMay cost more thanaugmenting EA survey.Need to train personnel.Initial cost.1 Exact Figure to advised

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!