13.07.2015 Views

332312A - E4-5 Meter-Mix Dispense System, Operation ... - Graco Inc.

332312A - E4-5 Meter-Mix Dispense System, Operation ... - Graco Inc.

332312A - E4-5 Meter-Mix Dispense System, Operation ... - Graco Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Screen IdentificationIconDescriptionBefore starting to prime, decrease the regulated air pressure to 20 psi (140 kPa, 1.4 bar)- Reducing the pressure prevents pump cavitation. <strong>Inc</strong>rease as needed. Refer to Purgeand Prime the Pump, page 28, for details on purging the machine. The pump will startoperating as soon as the “Start Pump” button is pressed on the monitor screen once themode is allowed.Intended to check the ratio of the machine. The outlet valves will not open and faults willnot be generated. To check the ratio, refer to Ratio Testing, page 36. The pumps willactuate as soon as the “Start Pump” button is pressed on the monitor screen.Transfer Mode allows both pumps to operate independently. Typical applications for themode are for filling small cartridges individually or feeding the 600 series metering units.The pumps are active as soon as the “Start Pump” button is pressed on the monitorscreen.Navigates to the “Monitor Screen”.Navigates to the “Main Screen”.Navigates to view the alarm history of the machine.Toggles the color injector for the corresponding machine (1 or 2) on or off. The injectorworks with the “<strong>System</strong> Ready Bit”, and operates under the parameters on the PresetScreen.This is a banner that tells the user what mode the machine is in.This is a button that goes to a screen showing the software part numbers and revisions.<strong>332312A</strong> 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!