13.07.2015 Views

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Determination ReportMACARTHUR 2 COMMUTER CAR PARKSubmission Number Issues raised TIDC responsethe CityRail network.The <strong>Macarthur</strong> 2 commuter car park <strong>for</strong>ms part of a broaderstrategy to improve public transport provision in the<strong>Macarthur</strong> Town Centre. This will ultimately include theexisting commuter car park at <strong>Macarthur</strong> Square Shopping,which is located less than 100 m to the <strong>Macarthur</strong> stationand a new commuter car park will also be provided offMenangle Road adjacent to Station (<strong>Macarthur</strong> 1). Thesethree long term commuter car parks will adequately provide<strong>for</strong> the public transport needs of park and ride commutersinto the future.Community submission(2), (16), (17), (18),(23), (30), (37), (41),(43)Community submission(2), (8), (9), (16), (18),(21), (23), (25), (26),(27), (41), (42), (43)Campbelltown Local Area Police should be consulted –crime impacts on commuters and their vehicles,increased workload <strong>for</strong> local Police, undesirable activityon the site after hours, car parks become neglected andderelictLands north of <strong>Macarthur</strong> station on TAFE and Universityof Western Sydney side should be investigated <strong>for</strong> furthersite optionsDevelopment of air space above the station should alsobe considered.TIDC provided the Campbelltown Police Crime PreventionOfficer with the REF <strong>for</strong> comment. Please Refer to submission47 from <strong>NSW</strong> Police Service – Campbelltown Local AreaCommand below <strong>for</strong> TIDC response.Sites on the northern side of the station were assessed andfound to be not considered suitable due to the lack ofexisting infrastructure (roads utilities) and unsuitability ofthe land (gradient etc.).Land on the north side of the railway line is also planned <strong>for</strong>university purposes and is not available. Part of this land isalso in private ownership and not available <strong>for</strong> car park use.Further to the north are playing fields designated as openspace.There are also a number constraints to redevelopment ofland on the north side which includes the following• flooding (in the Bow Bowing Creek floodplain)• an identified Cumberland Plain Woodland (CPW)1055342_2.DOC 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!