13.07.2015 Views

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Northern siteAccess to station• Requires vehicular and pedestrianupgrades - access road, lift, lightingand accessible pathways.• Safety and passive surveillance is alsolacking on this side of the station.• Isolated from other complementarytown centre uses• Not located en route to commutercatchment (commuters mostly arrivingfrom south side)Environment• Sloping land – would require fill andretaining walls• Subject to flooding (within 1:100 floodplain of Bow Bowing Creek) wouldrequire imported fill• Hydrology – realignment of Bow BowingCreek required• Cumberland Plain Woodland vegetation– Endangered Ecological Community –earmarked <strong>for</strong> further offset plantingInfrastructure cost• On-site earthworks construction coststo achieve level car park as required byDDA• Off-site enabling works required <strong>for</strong>local road upgrades (roundabouts,signal controls)• Off-site works <strong>for</strong> DDA upgrade ofexisting pedestrian paths, liftinstallation to pedestrian overpass• Stormwater design and relocation ofBow Bowing Creek• Riparian zone revegetation requiredoff-site• Extensive lighting and CCTV requiredFuture planning• Master planned <strong>for</strong> university/TAFEpurposes and not available.• Other land is owned by Landcom isapproved <strong>for</strong> future residentialdevelopment (<strong>Macarthur</strong> Gardens -north), land not available• Public Open Space – Gilchrist Ovalplaying fields <strong>for</strong> local community• Land not availableSouthern site• Can link into <strong>Macarthur</strong> 1 commuter carpark which contains a new pedestrian linkon north side of Menangle Road• Close to town centre activity• Links with the <strong>Macarthur</strong> Square retaildevelopment (existing and proposed)• Closer to other transport interchangefacilities• Located on main road <strong>for</strong> publicsurveillance and vehicle access• Drainage can be accommodated with onsitedetention and installation of GrossPollutant Trap• On-site construction - relatively flat site – noretaining walls or embankments required• Off-site construction of Tailby Street androundabout required• DDA path requires upgrade of link to station– lighting costs along Menangle Road andwidened footpath• Option 1 (Bolger Street car park) –proposed tavern - land not available <strong>for</strong>purchase from private landowner• Option 2 (proposed site) land available <strong>for</strong>purchase from landowner• Option 3 (private ownership) commercialdevelopment plans - land not available• Displacement of land earmarked <strong>for</strong>residential purposes1058990-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!