13.07.2015 Views

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

Macarthur 2 Commuter Car Park - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Determination ReportMACARTHUR 2 COMMUTER CAR PARKSubmission Number Issues raised TIDC responseDevelopment Application (DA) nos. F540/2003 andG111/2003. The DA consent conditions also requirerehabilitation of the riparian zone at Bow BowingCreek, north / west of the <strong>Macarthur</strong> 2 car park site.This rehabilitation involves revegetation, rehabilitation,and establishment of the riparian zone using nativespecies appropriate to the site and propagated fromlocal genetic stock.TIDC will now take possession of the site with noexisting vegetation, which now means that there is norequirement <strong>for</strong> a biodiversity offset strategy. HoweverTIDC will provide landscaping and native vegetation atthe car park site, as well as a vegetation managementplan <strong>for</strong> replaced vegetation.(w) ‘Assessment of Significance’ guidelines produced byDECCW have not been followed <strong>for</strong> ‘local occurrence’(x) The proposed ‘offset’ of lost vegetation should avoidsignificant impact on the River Flat Eucalypt ForestEndangered Ecological Community (EEC).(y) The Vegetation Management Plan (VMP) should alsomanage vegetation not removed during thedevelopment and any riparian vegetation(z) Downstream water quality has not been addressedin the drainage design (GPT will not collect oil or stopsediment loss during construction)(w) DECCW has provided feedback on the field survey andthis has been responded to (refer to Appendix 6).(x) A biodiversity offset strategy <strong>for</strong> the site is no longerrequired as the site has been cleared of vegetation bythe current owners.(y) TIDC will provide landscaping and native vegetation atthe car park site, as well as a vegetation managementplan in consultation with Council (Refer ConditionNo.26)(z) The Gross Pollutant Trap proposed to be installed willcatch appropriate pollutants, and sediment caused byconstruction will be appropriately managed with amanagement plan. A current review of all water qualitymeasures is currently being undertaken by TIDC andRailCorp on all commuter car parks in the CCPP.1055342_2.DOC 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!