13.07.2015 Views

Boulder Valley School District Educational Facilities Master Plan

Boulder Valley School District Educational Facilities Master Plan

Boulder Valley School District Educational Facilities Master Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Boulder</strong> <strong>Valley</strong> <strong>School</strong> <strong>District</strong><strong>Educational</strong> <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong>• Increase the bandwidth to every building in the <strong>District</strong>• Increase the effectiveness of the school LANs with the new computers currently beinginstalled• Leverage the fiber optic network to run the VoIP• Enable cost savings for the running of phone system• Allow for the distribution of video content to every classroomHardware: The proposed solution will require the procurement of hardware to operatethe WAN, LAN, and the VoIP systems. It will include servers, switches, routers, andhubs as well as phones.WAN• Leasing of the fiber optical cable for 53 locations throughout BVSD:• 28 Elementary <strong>School</strong>s• 5 K-8 <strong>School</strong>s• 10 Middle <strong>School</strong>s• 6 High <strong>School</strong>s• 1 K-12 <strong>School</strong>• 2 Bus Terminals• 1 Community <strong>School</strong>• Ed Center/VO-TECH• Two pairs of dark fiber going to data entry point in each building in the WAN• One Gbps to every buildingLAN• Hubs, routers, and switches that support fiber-optic capacities• Installation of new wiring where required in each classroom, office, andworkspace to support speeds of 100 Mbps or higher to each workstation locationVoice-Over-Internet Protocol• Servers• Phones in each classroom, office, and workspace• WiringSoftware: The proposed solution will require the purchase of software to support theWAN, LAN, and VoIP. The specific software will be based on the vendor’s proposal.1. Integration issues: There are no other systems with which the solution mustinteroperate.2. Procurement approach: It is expected that the current BVSD RFP procedures willbe used to procure the proposed solution.Approach: The BVSD staff will develop the RFP to procure a vendor that willdevelop RFP for:• Project Management• Independent project oversight and verification• Installation of the WAN• Installation of the LAN at all BVSD locationsCapital Improvement <strong>Plan</strong>ning Committee May 2006 Page 91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!