Table 6-1. Estimated Cost for OU 12 Vadose <strong>Zone</strong> Investigation Using HSATask Duration Quantity Unit Unit Cost Total Cost Assumptions(days)Project PlansDraft Work Plan 40 1 ls $20,000 $20,000 Assume standard cost and preparation time for project plans (WP, HASP, and SAP).USAF Review 30 --- --- --- --- Assume standard 30-day review cycle.Final Work Plan 21 1 ls $5,000 $5,000 Assume standard time and cost to respond to comments and modify project plans.Subtotal $25,000Phase I InvestigationCoordination and Planning 5 40 hr $65 $2,600 Includes subcontractor coordinate, site preparation, utilities clearance, cleanup, and IDW disposal.Sample Collection 9- mobilization/demobilization --- 1 ls $1,000 $1,000 Mobilization/demobilization cost based on recent quote.- drilling --- 1020 lf $19 $19,380 Drill 17 locations to 60 ft bgs (1,020 linear ft) with sample collection every 2 ft starting at 20 ft- deconning --- 18 hr $85 $1,530 bgs for a total of 20 samples per location. Assume 9 days drilling with 2 hr/day deconning.- field geologist --- 108 hr $65 $7,020 Assume 9 days x 12 hr/day = 108 hrs for field geologist to log cores and collect samples.- borehole abandonment --- 1020 lf $5 $5,100 Borehole abandonment based on recent quote.- sample shipment --- 18 ea $75 $1,350 Assume overnight shipping includes 2 shipments/day x 9 days = 18 shipments.Off-Site Laboratory Analysis 15 374 ea $135 $50,490 Assume 10% QC samples; 20 samples/loc x 17 loc x 1.1 = 374 samples.Subtotal $88,470Data Evaluation and <strong>Report</strong>ingUpdate CSM 14 80 hr $90 $7,200 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.Draft Tech Memo/Sampling Plan 21 60 hr $90 $5,400 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.USAF Review 30 --- --- --- --- Assume standard 30-day review cycle.Final Tech Memo/Sampling Plan 14 24 hr $90 $2,160 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.Subtotal $14,760Phase II Investigation (Data Gap Collection)Coordination and Planning 5 24 hr $65 $1,560 Includes subcontractor coordinate, site preparation, utilities clearance, cleanup, and IDW disposal.Sample Collection 3- mobilization/demobilization --- 1 ls $1,000 $1,000 Mobilization/demobilization cost based on recent quote.- drilling --- 360 lf $19 $6,840 Drill 6 locations to 60 ft bgs (360 linear ft) with sample collection every 2 ft starting at 20 ft- deconning --- 6 hr $85 $510 bgs for a total of 20 samples per location. Assume 3 days drilling with 2 hr/day deconning.- field geologist --- 36 hr $65 $2,340 Assume 3 days x 12 hr/day = 36 hrs for field geologist to log cores and collect samples.- borehole abandonment --- 360 lf $5 $1,800 Borehole abandonment based on recent quote.- sample shipment --- 6 ea $75 $450 Assume 2 shipments/day x 3 days = 6 shipments.Off-Site Laboratory Analysis 15 132 ea $135 $17,820 10% QC samples; 20 samples/loc x 6 loc x 1.1 = 132 samples.Subtotal $32,320Remedial Investion (RI) <strong>Report</strong>Update CSM 10 48 hr $90 $4,320 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.Draft RI <strong>Report</strong> 30 120 hr $90 $10,800 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.USAF Review 30 --- --- --- --- Assume standard 30-day review cycle.Final RI <strong>Report</strong> 21 40 hr $90 $3,600 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.ERPIMS Data Package --- 48 hr $70 $3,360 Laboratory includes ERPIMS-formatted electronic data package.Subtotal $22,080IDW Disposal (Soil)Roll-off and Hazardous Waste Tranportation --- 1 ls $1,500 $1,500Hazardous Waste Disposal (Incineration) --- 34,155 lb $0.29 $9,905 Assume 1,485 lb TCE-contaminated soil per location using 8.25-inch diameter auger, upper 20RCRA State Tipping Fee --- 17 ton $28 $476 feet uncontaminated, and bulk soil density of 100 lb/cubic foot; 23 total locations.Subtotal $11,881Travel 18 hr $65 $1,170 Assume 1.5 hr/day x 18 days (9 days for phase I and 3 days for phase II) local travel for geologist.Subtotal 313 --- --- --- $195,681Project Management --- --- --- --- $19,568 Assume 10% of project subtotal cost for project management.Total $215,249March 2003 6-3OU 12 <strong>Demonstration</strong> <strong>Report</strong>Final