13.07.2015 Views

Source Zone Delineation Demonstration Report - Triad Resource ...

Source Zone Delineation Demonstration Report - Triad Resource ...

Source Zone Delineation Demonstration Report - Triad Resource ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 6-2. Estimated Cost for OU 12 Vadose <strong>Zone</strong> Investigation Using DPTTask Duration Quantity Unit Unit Cost Total Cost Assumptions(days)Project PlansDraft Work Plan 40 1 ls $20,000 $20,000 Assume standard cost and preparation time for project plans (WP, HASP, and SAP).USAF Review 30 --- --- --- --- Assume standard 30-day review cycle.Final Work Plan 21 1 ls $5,000 $5,000 Assume standard time and cost to respond to comments and modify project plans.Subtotal $25,000Phase I InvestigationCoordination and Planning 5 40 hr $65 $2,600 Includes subcontractor coordinate, site preparation, utilities clearance, cleanup, and IDW disposal.Sample Collection 9- mobilization/demobilization --- 1.5 hr $110 $165 Assume local mobilization/demobilization cost.- DPT rig with operator --- 108 hr $140 $15,120 Drill 17 locations to 60 ft bgs with sample collection every 2 ft starting at 20 ft bgs for a total of 20- drillers assistant --- 108 hr $45 $4,860 samples per location. Assume 2 locations per day = 9 days x 12 hr/day = 108 hrs.- field geologist --- 108 hr $65 $7,020 Assume 9 days x 12 hr/day = 108 hrs for field geologist to log cores and collect samples.- bentonite grout --- 34 bag $25 $850 Assume 2 bags of bentonite grout per location; 17 total locations.- sample shipment --- 18 ea $75 $1,350 Assume overnight shipping includes 2 shipments/day x 9 days = 18 shipments.Off-Site Laboratory Analysis 15 374 ea $135 $50,490 Assume 10% QC samples; 20 samples/loc x 17 loc x 1.1 = 374 samples.Subtotal $82,455Data Evaluation and <strong>Report</strong>ingUpdate CSM 14 80 hr $90 $7,200 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.Draft Tech Memo/Sampling Plan 21 60 hr $90 $5,400 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.USAF Review 30 --- --- --- --- Assume standard 30-day review cycle.Final Tech Memo/Sampling Plan 14 24 hr $90 $2,160 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.Subtotal $14,760Phase II Investigation (Data Gap Collection)Coordination and Planning 5 24 hr $65 $1,560 Includes subcontractor coordinate, site preparation, utilities clearance, cleanup, and IDW disposal.Sample Collection 3- mobilization/demobilization --- 1.5 hr $110 $165 Assume local mobilization/demobilization cost.- DPT rig with operator --- 36 hr $140 $5,040 Drill 6 locations to 60 ft bgs with sample collection every 2 ft starting at 20 ft bgs for a total of 20- drillers assistant --- 36 hr $45 $1,620 samples per location. Assume 2 locations per day =3 days x 12 hr/day = 36 hrs.- field geologist --- 36 hr $65 $2,340 Assume 3 days x 12 hr/day = 36 hrs for field geologist to log cores and collect samples.- bentonite grout --- 12 bag $25 $300 Assume 2 bags of bentonite grout per location; 6 total locations.- sample shipment --- 6 ea $75 $450 Assume 2 shipments/day x 3 days = 6 shipments.Off-Site Laboratory Analysis 15 132 ea $135 $17,820 10% QC samples; 20 samples/loc x 6 loc x 1.1 = 132 samples.Subtotal $29,295Remedial Investion (RI) <strong>Report</strong>Update CSM 10 48 hr $90 $4,320 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.Draft RI <strong>Report</strong> 30 120 hr $90 $10,800 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.USAF Review 30 --- --- --- --- Assume standard 30-day review cycle.Final RI <strong>Report</strong> 21 40 hr $90 $3,600 Assume an average rate of $65/hr for geologist and $115/hr for hydrogeologist/engineer.ERPIMS Data Package --- 48 hr $70 $3,360 Laboratory includes ERPIMS-formatted electronic data package.Subtotal $22,080IDW Disposal (Soil)Drum and Hazardous Waste Tranportation --- 1 ls $500 $500 Assume three 55-gallon drums of TCE-contaminated soil generated during sampling.Hazardous Waste Disposal (Incineration) --- 2000 lb $0.29 $580 Assume 87 lb TCE-contaminated soil per location using 2-inch diameter DPT rod, 40 ft totalRCRA State Tipping Fee --- 1 ton $28 $28 depth per location, and bulk soil density of 100 lb/cubic foot; 23 total locationsSubtotal $1,108Travel 18 hr $65 $1,170 Assume 1.5 hr/day x 18 days (9 days for phase I and 3 days for phase II) local travel for geologist.Subtotal 313 --- --- --- $175,868Project Management --- --- --- --- $17,587 Assume 10% of project subtotal cost for project management.Total $193,455March 2003 6-4OU 12 <strong>Demonstration</strong> <strong>Report</strong>Final

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!