13.07.2015 Views

Strategic Flood Risk Assessment - Wiltshire Council

Strategic Flood Risk Assessment - Wiltshire Council

Strategic Flood Risk Assessment - Wiltshire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Wiltshire</strong> <strong>Council</strong>SFRA High Level Executive SummaryTable 5-2: Indicative flood defence cost rates (per linear metre) – new embankment (source:Environment Agency)Volume (m 3 )Volume 500-5,000 5,000-15,000 >15,000Cost Range (£/m 3 ) 31-116 29-53 17-31Average Cost(£/m 3 )* 75 40 25Average cost perlinear metre (£/m)* 900 480 300*An indicative volume of 12 m 3 per metre run of defence has been used within the calculations.Table 5-3: Upgrading flood defence indicative costs rates (per linear metre) (source:Environment Agency)Type of Upgrade£/mRebuild & Raise Hard Defences 4,800Strengthen embankment with sheet pile 3,600Additional capping to sheet pile 900Table 5-4 Indicative costs of new and refurbished outfall (source Environment Agency)Type of Outfall £New Small outfall (900mm) 540,000Refurbished Small outfall (900mm) 270,0005.5.7 The values provided by the Environment Agency within Table 5-3 and Table 5-4 have beenincreased by 20% to provide a conservative estimate of the increase in cost from originalstudies.5.5.8 In addition to the capital costs, the Environment Agency maintains defences within the studyarea through a programme of repairs and upkeep of flood defence structures. This includesgrass cutting, desilting, maintenance of drains, debris removal and scrub clearance.27 June 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!