Strategic Flood Risk Assessment - Wiltshire Council
Strategic Flood Risk Assessment - Wiltshire Council
Strategic Flood Risk Assessment - Wiltshire Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Wiltshire</strong> <strong>Council</strong>SFRA High Level Executive SummaryTable 5-2: Indicative flood defence cost rates (per linear metre) – new embankment (source:Environment Agency)Volume (m 3 )Volume 500-5,000 5,000-15,000 >15,000Cost Range (£/m 3 ) 31-116 29-53 17-31Average Cost(£/m 3 )* 75 40 25Average cost perlinear metre (£/m)* 900 480 300*An indicative volume of 12 m 3 per metre run of defence has been used within the calculations.Table 5-3: Upgrading flood defence indicative costs rates (per linear metre) (source:Environment Agency)Type of Upgrade£/mRebuild & Raise Hard Defences 4,800Strengthen embankment with sheet pile 3,600Additional capping to sheet pile 900Table 5-4 Indicative costs of new and refurbished outfall (source Environment Agency)Type of Outfall £New Small outfall (900mm) 540,000Refurbished Small outfall (900mm) 270,0005.5.7 The values provided by the Environment Agency within Table 5-3 and Table 5-4 have beenincreased by 20% to provide a conservative estimate of the increase in cost from originalstudies.5.5.8 In addition to the capital costs, the Environment Agency maintains defences within the studyarea through a programme of repairs and upkeep of flood defence structures. This includesgrass cutting, desilting, maintenance of drains, debris removal and scrub clearance.27 June 2009