13.07.2015 Views

Pathfinder Orange Book for Version 2.2.4 - RNE

Pathfinder Orange Book for Version 2.2.4 - RNE

Pathfinder Orange Book for Version 2.2.4 - RNE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pathfinder</strong> <strong>Orange</strong> <strong>Book</strong> <strong>Version</strong> <strong>2.2.4</strong>2.2.1 Dossier Phases in NEW PATH REQUEST (also referenced as “Path Request” or “RegularPath Request”)2.2.1.1 Dossier phase - OpenIn this phase, the Dossier is only available to the person who created (opened) it. The Dossier canbe changed and saved at will. It is in this stage of the process that the basic data is recorded.The participating RU’s and infrastructure managers are identified in the Open phase. Changing theparticipating companies is still possible at any stage of the process. (See also 27.7. Defining andchanging the participating companies )There is no limitation on the number of companies that can participate. Any number of RU’s andinfrastructure managers can be involved in one Dossier. A participating company does not have tohave stops included in the timetable. Other companies can also be involved in the approvalprocess, <strong>for</strong> example service companies.It is not compulsory under <strong>Pathfinder</strong> <strong>for</strong> more than one RU or infrastructure manager to beinvolved in one Dossier, because, <strong>for</strong> example, the catalogue paths of a company can also bemade available via <strong>Pathfinder</strong>.(New since <strong>2.2.4</strong>): When the RU configures the requested timetable and enters the operationpoints, the system automatically recognizes the Infrastructure Managers which are responsible <strong>for</strong>the particular operation point and adds them (if they are not added manually) to the list ofparticipating IMs to the dossier.When the Dossier is released <strong>for</strong> the other participating RU’s, the Dossier enters the Harmonizationphase.Please note that this phase is present in all <strong>Pathfinder</strong> processes, and can be viewed and editedonly by the user of the leading company that has opened the dossier.2.2.1.2 Dossier phase – HarmonizationPlease note that this phase is available <strong>for</strong> New Path Request and also <strong>for</strong> other processes suchas regular Late Path Request and Ad-Hoc Path Request.Once the basic data has been recorded, the Dossier should be checked by the other participatingRU’s and added to or corrected as required. This takes place during the Harmonization phase. Allthe RU’s that were entered in the Open phase receive the Dossier. The Dossier can be viewed andamended by all the participating RU’s. Within the requested timetable, each RU can only makechanges, or have the data updated through <strong>Pathfinder</strong> Integration Plat<strong>for</strong>m, in the section assignedto them.The aim of this stage of the process is <strong>for</strong> all participating RU’s to give their approval to theDossier. This is done by using the following acceptance indicators:Green = concept approved AcceptedYellow = concept currently being processed Being processedRed = concept rejected Not acceptedBlue = no knowledge of the conceptBy approving a Dossier, an RU indicates to the IM that it will place the path request <strong>for</strong> this path. Itshould be noted that the Harmonization phase must be at least long enough <strong>for</strong> all participatingRU’s to have the opportunity to give their comments on and evaluation of the Dossier. When allparticipating agencies have worked together and put their acceptance indicators to green, theleading RU can move the dossier into the next phase, so called Path Request.December 2010 Page 16 of 133

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!