13.07.2015 Views

Pathfinder Orange Book for Version 2.2.4 - RNE

Pathfinder Orange Book for Version 2.2.4 - RNE

Pathfinder Orange Book for Version 2.2.4 - RNE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pathfinder</strong> <strong>Orange</strong> <strong>Book</strong> <strong>Version</strong> <strong>2.2.4</strong>the transport or to shift to another itinerary, the leading RU must have the possibility to withdrawthe request. An already accepted path between a cooperating RU and the relevant IM would beobsolete in that case.2.2.5.3 Harmonized and Non-Harmonized Short Term Request OfferIf the leading RU issues the Path Request, and all RU-lights were green, the system provides apossibility to the leading IM to choose model <strong>for</strong> dossier handling <strong>for</strong> harmonized and nonharmonizedoffer. If the leading IM chooses the harmonized offer dossier handling model, the systemtreats the dossier in the same way as “normal” Ad-Hoc Path Request.RUs do not see the different process types when opening a dossier - Harmonized/Non-Harmonized– this possibility to decide between these two options <strong>for</strong> offer is given only to the leading IM in thePath Elaboration phase <strong>for</strong> the special case described above. For simplicity, and also <strong>for</strong> translatedvariants of process type names, process types “Short Term Path Request” is always understood as“non-harmonized” and <strong>for</strong> the “harmonized” case we use “Short Term Path Request (Harmonized)”.2.2.5.4 Acceptance, Post –Processing, Final Offer and Active TimetableThe RU is always in position to decide whether the Post-Processing is needed or not. If “Short TermPath Request” is processed in “non-harmonized” mode, the dossier can be transferred fromAcceptance to Active timetable <strong>for</strong> the RU-IM pair that has both green lights (RU and IM) by usingthe button “Accept”.In the Acceptance phase, the RUs have the two buttons: “Release post-processing” and “Accept”. If“Accept” is used, the Post-processing and Final Offer phases are treated just as milestones, thedossier is transferred directly to Active Timetable. If “Post-processing” is chosen, the phases Postprocessingand Final Offer are interpreted as normal phases.If “Short Term Path Request” is processed in “harmonized” mode (i.e. if leading IM has chosen“Move to Short Term PR Harmonized” during the Path Elaboration), the dossier can be transferredfrom Acceptance to Active timetable by using the button “Accept” only if all RU lights are green. As itwas written above, if this was done, the dossier is transferred directly to Active Timetable and thephases Post-processing and Final Offer are treated as milestones.Furthermore, it is also valid <strong>for</strong> the leading RU to activate “Post-processing” as it is the case <strong>for</strong> allother process types. In that case, the dossier has to be switched manually (as <strong>for</strong> other processtypes) through Post-processing and Final Offer.December 2010 Page 28 of 133

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!