13.07.2015 Views

SHLAA _version 6_ - 2011 Update Document - Basingstoke and ...

SHLAA _version 6_ - 2011 Update Document - Basingstoke and ...

SHLAA _version 6_ - 2011 Update Document - Basingstoke and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Total LargePermissions 2714 662 346 396 410 320 158 31 32 0 0 359Total SmallPermissions All 197 40 40 39 39 39 0 0 0 0 0 0TotalCommitments 2911 702 386 435 449 359 158 31 32 0 0 359Notes1. The dwelling yields <strong>and</strong> phased completions have been agreed between BDBC <strong>and</strong> HCC2. The 'status/comments’ column refers to the 'SAA' tests. These relate to sites being required to be 'suitable, available<strong>and</strong> achievable ' in order to be included in the Borough’s five year l<strong>and</strong> supply. These tests are set out in detail in stage 7of the <strong>SHLAA</strong> methodology <strong>and</strong> PPS3 defines them as follows:- available - the site is available now- suitable - the site offers a suitable location for development now <strong>and</strong> would contribute to the creation of sustainable,mixed communities- achievable - there is a reasonable prospect that housing will be delivered on the site within five yearsAppendix 2: Table of Rejected Sites (additional to existing appendix)The following sites are added to the list of rejected sites listed in Appendix 2. The information follows the same format asthat used in Version 6 of the <strong>SHLAA</strong>. Sites that have not previously been considered through the <strong>SHLAA</strong> (i.e. new sites)are highlighted in bold, whilst the remaining sites are those that have previously been included in other appendices of the<strong>SHLAA</strong> but which, through the annual monitoring process, have been identified as no longer representing a developmentopportunity.Site Ref Site Name Settlement Reason for Rejection<strong>Basingstoke</strong>BAS017Chineham TradingCentre, 1 Reading Roadthe availability tests.BAS056Church, Wessex Close<strong>Basingstoke</strong>The site is in multiple tenancies <strong>and</strong> the ownership of the site is unknown. There hasbeen no recent developer interest. It is therefore considered that the site no longer meetsAlthough there is known developer interest in the site, given its constrained nature it isconsidered that the site would yield less than 5 dwellings. The <strong>SHLAA</strong> does not include10 of 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!