13.07.2015 Views

Aireys Inlet Recreation Infrastructure Strategy ... - Surf Coast Shire

Aireys Inlet Recreation Infrastructure Strategy ... - Surf Coast Shire

Aireys Inlet Recreation Infrastructure Strategy ... - Surf Coast Shire

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Location CThe third location option, on Bambra Road places a field at the northern end of the largestblock close to Luggs Road. This is the preferred site as it is less likely to require filling,however the higher land price here may be prohibitive, unless a portion of the block canbe acquired. The advantages and disadvantages of Location C are listed below.Advantages and disadvantages of Location CADVANTAGESFacility mostly outsideflood overlayThe largest block that ifpurchased would enableother environmentalcomponents to be included;for example wetland andstorm water treatmentA more central locationthan the northern parcelsDISADVANTAGESThe best site for a dwellingand therefore there may bedifficulties in acquiring thesite at a reasonable priceClosest to residencesPart 2 <strong>Infrastructure</strong> Details And Options 33Changing the land use of thelargest site to environmentaland recreational (from farmingand residential) will make alarger positive impact thandeveloping the smaller sites)Flattest locationPurchase of a small portion ofthis large block may be lessexpensive and more achievableCost in servicing the site will beless as it is closer to the roadLess filling would be requiredEstimated probable costs of Location C–– Market land value$2,650,000 est.–– Capital cost (construction of oval) $801,450 - $1,208,340–– See probable costs in Appendix 4.133096

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!