13.07.2015 Views

Installation Instructions - Vivid Racing

Installation Instructions - Vivid Racing

Installation Instructions - Vivid Racing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

www.vf-engineering.comPorsche 997 (US MODEL) Stage1 INSTALLATION13. Lay out the water lines supplied in the kit (as shown below) to familiarize yourself with theirrouting.14. Route the driver’s side lateral hose from the water pump’s output (large connection), through thedriveshaft tunnel up towards the front of the vehicle. Make sure the hose will not interfere with anymoving parts. Connect the hose to the water pump.PAGE 13 of 51P/N: VFM59-01© 2006 VF EngineeringAll rights reservedRev 1.11.21.06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!