13.07.2015 Views

Installation Instructions - Vivid Racing

Installation Instructions - Vivid Racing

Installation Instructions - Vivid Racing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

www.vf-engineering.comPorsche 997 (US MODEL) Stage1 INSTALLATION35. Repeat steps 28-31, this time, on the driver side.36. Reconnect the cam position sensor, vacuum connections and clips, and remount the plastic fuelinjector wiring casing.37. Remove the alternator (with pulley), throttle body, and oil fill tube to gain access to the rearcrankcase ventilation tube fitting.PAGE 29 of 51P/N: VFM59-01© 2006 VF EngineeringAll rights reservedRev 1.11.21.06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!