21.07.2015 Views

Bio-SNG - CNG Services

Bio-SNG - CNG Services

Bio-SNG - CNG Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECT6.1.3 Operating Cost assumptionsThe basic cost assumptions are shown in Table 6-3, based on industry norms and specific informationrelating to the feedstock type. The capital cost assumptions have assumed oxygen is supplied „over thefence‟, although in line with the efficiency assumptions, it is presumed that power is supplied FoC to theprovider (ie no benefit is taken on the revenue side from power generated). This may not be the out-turncommercial configuration, but ensures that the oxygen cost base is fully accounted for.Costs £000s Small (£000) Large (£000)Fixed costsLabour,MaintenanceInsuranceLand LeaseRates, permitting, Monitoring, ConnectionsTotal£1,000£1,300£400£100£500£3,300£1,000£4,300£1,300£200£1,500£8,300Oxygen (over the fence with powersupplied FOC)£650£25/te exclpower (3.5te/hr)£2,300£15/te excl power(21te/hr)Consumables £250 £1,000Consumables SRF £500 £2,000Disposal costs biomass £0 £0Disposal costs SRF £600£40/te & 15,000te pa (20% ash)£3,600(£40/te & 90,000te pa (20% ash)Total <strong>Bio</strong>mass £4,200 £11,600Total SRF £5,050 £15,200Table 6-3 Operating Cost assumptions6.1.4 FeedstockSRF Woodchip Pellet18 GJ/te60%energy <strong>Bio</strong>13 GJ/te100%energy <strong>Bio</strong>16 GJ/te100%energy <strong>Bio</strong>-£27/te £65/te £112/te-1.5 GJ/te 5.0 GJ/te 7 GJ/teTable 6-4 Feedstock Assumptions48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!