21.07.2015 Views

Bio-SNG - CNG Services

Bio-SNG - CNG Services

Bio-SNG - CNG Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECTa full scale plant development, especially given the use of conventional process technologies. Eitherway, these are unlikely to be projects that could be funded with project finance (equity plus debt), and thedeveloper would need to be able to justify the risk / reward balance as the equity holder in the project.Again, a hybrid development approach could offer risk mitigation potential, by taking syngas at full scalefrom a conventional fossil fuelled source for the production of fossil <strong>SNG</strong>. Subsequently the source offossil syngas could move to co-firing biomass. Alternatively a biomass gasifier could be developed lateron for a dedicated supply of <strong>Bio</strong>-syngas to the <strong>SNG</strong> facility. In Teesside the Progressive Energy EstonGrange development within the Teesside carbon dioxide capture cluster 61 could be a possible source ofsyngas for initial <strong>SNG</strong> production 62 . The general concept is outlined in Figure 9.2.Storage / EORGasificationSyngasscrubbingCO 2capturePowergenerationCoal(+ Poss futurebiomass)SlipstreamFuture <strong>Bio</strong>massGasifier plantSyngasconditioningMethanationetc.<strong>SNG</strong> comp. &exportFigure 9.2Hybrid development optionA full scale <strong>Bio</strong>-<strong>SNG</strong> facility of 300MWth capacity would probably be built with two gasifier trains in orderto ”standardise” on gasifier frame sizes and to offer a degree of system redundancy. These would feed asingle gas processing train in order to benefit from the economies of scale. It will be readily appreciatedtherefore that migration from fossil syngas to bio-syngas could be accomplished in stages as each of thebiomass gasifier trains is brought on line. This again assists in risk management in the gasifierdeployment, allowing also a staged ramp-up of biomass fuel supply.9.2 LOCATION: THE NORTH EASTThe North is an attractive location for the development of the type of project contemplated here. It has along history of Chemical and processing industries. Therefore it has the necessary gas and servicesinfrastructure and the transport links as well as the people and skill base. The existing industrial backdropcan accommodate the kind of processing plant under consideration, with a range of suitable and availablesites. Changes to and closure of existing industries mean that new facilities which offer employment andregeneration are welcomed, so that a balanced view is taken during planning.61 See Appendix 462 It must be noted that the increased complexity for the host project imposed by the <strong>Bio</strong>-<strong>SNG</strong> addition may provechallenging.77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!