21.07.2015 Views

Bio-SNG - CNG Services

Bio-SNG - CNG Services

Bio-SNG - CNG Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECTinfrastructure showed that both sites have reasonable accessibility to medium to high pressure gas mainswith sufficient capacity for 20,000Nm 3 /hr (Figure 9.5). Both these sites are believed to form part ofregional development plans, specifically designed to encourage and enable development. These sites arealso relatively close to the slated syngas development projects under way, with Air Products and Ineos<strong>Bio</strong> on the North side of the Tees, and the Eston Grange Project on the South. Figure 9.6show thephotographs on the sites considered. The facilities shown in Appendix 1 would not be out of place inTeesside. In summary, it is clear that Teesside offers a range of potentially suitable sites for a project ofthis type.Figure 9.4North and South bank sites of most interest80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!