Bio-SNG - CNG Services
Bio-SNG - CNG Services
Bio-SNG - CNG Services
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Net cost of <strong>Bio</strong>-<strong>SNG</strong> after assumed RHI (£/MWh)BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECT6.3.2 Impact of capital Cost, Opex, Fuel price, RHI and heat sales40.035.0SRFSenstivity Analysis for large facilityWoodchip30.025.020.015.010.05.00.0Figure 6.8Base Capex +30% Opex +30% Fuel +£1.5/GJ Fuel -£1.5/GJ RHI £50Sensitivity analysis for large scale facility fuelled by SRF and woodchip.Capital cost: As shown in Figure 6.8, an increase in capital cost of 30% would be significant for bothfacilities, although as a proportion of the base case <strong>Bio</strong>-<strong>SNG</strong> price has a proportionately higher impact forSRF. However, an SRF facility might still provide an acceptable outturn bio-<strong>SNG</strong> cost, whereas awoodchip fuelled facility would not be feasible at the gas prices considered.Operational cost: this is a less sensitive variable than capital cost, but clearly must be managed.Fuel: For woodchip, +/-£1.5/GJ represents a fluctuation of +/-£19/te or +/-30% around a base case of£65/te. This variation has a significant impact on the outturn <strong>Bio</strong>-<strong>SNG</strong> cost. An increase of this levelwould provide a <strong>Bio</strong>-<strong>SNG</strong> cost significantly beyond the gas prices considered . For SRF +/-£1.5/GJrepresents a more significant fluctuation of +/-£27/te or +/-100% around a base case gatefee of -£27/te.Whilst this is a sensitive variable, the bio-<strong>SNG</strong> cost could be viable even in the stress case.RHI: The RHI is a very sensitive variable. Increasing this to £50/MWh would enable projects based onboth feedstock types to attain a competitive outturn <strong>Bio</strong>-<strong>SNG</strong> cost on the assumption set indicated, andshould provide sufficient project returns to attract investment for an SRF or SRF-<strong>Bio</strong>mass blend facility.56