21.07.2015 Views

Bio-SNG - CNG Services

Bio-SNG - CNG Services

Bio-SNG - CNG Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Net cost of <strong>Bio</strong>-<strong>SNG</strong> after assumed RHI (£/MWh)BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECT6.3.2 Impact of capital Cost, Opex, Fuel price, RHI and heat sales40.035.0SRFSenstivity Analysis for large facilityWoodchip30.025.020.015.010.05.00.0Figure 6.8Base Capex +30% Opex +30% Fuel +£1.5/GJ Fuel -£1.5/GJ RHI £50Sensitivity analysis for large scale facility fuelled by SRF and woodchip.Capital cost: As shown in Figure 6.8, an increase in capital cost of 30% would be significant for bothfacilities, although as a proportion of the base case <strong>Bio</strong>-<strong>SNG</strong> price has a proportionately higher impact forSRF. However, an SRF facility might still provide an acceptable outturn bio-<strong>SNG</strong> cost, whereas awoodchip fuelled facility would not be feasible at the gas prices considered.Operational cost: this is a less sensitive variable than capital cost, but clearly must be managed.Fuel: For woodchip, +/-£1.5/GJ represents a fluctuation of +/-£19/te or +/-30% around a base case of£65/te. This variation has a significant impact on the outturn <strong>Bio</strong>-<strong>SNG</strong> cost. An increase of this levelwould provide a <strong>Bio</strong>-<strong>SNG</strong> cost significantly beyond the gas prices considered . For SRF +/-£1.5/GJrepresents a more significant fluctuation of +/-£27/te or +/-100% around a base case gatefee of -£27/te.Whilst this is a sensitive variable, the bio-<strong>SNG</strong> cost could be viable even in the stress case.RHI: The RHI is a very sensitive variable. Increasing this to £50/MWh would enable projects based onboth feedstock types to attain a competitive outturn <strong>Bio</strong>-<strong>SNG</strong> cost on the assumption set indicated, andshould provide sufficient project returns to attract investment for an SRF or SRF-<strong>Bio</strong>mass blend facility.56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!