21.07.2015 Views

Bio-SNG - CNG Services

Bio-SNG - CNG Services

Bio-SNG - CNG Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Net cost of <strong>Bio</strong>-<strong>SNG</strong> (p/therm) & Electricity (£/MWh)BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECTprobably still marginally preferable. However this would require a further level of analysis and costingbased around a specific project to confirm where the relative advantage lay in this case. It must also benoted that there is more international activity based on gasification for power generation, the regulatoryregime and practice for connection is more established, and the RO support mechanism has a longertrack record with investors.LCof <strong>Bio</strong>-<strong>SNG</strong> (RHI at £40/MWh) & electricity with 2 ROCs ( £50/MWh200180Small Large160140120100806040TypicalNatural Gas prices range (p/therm) andelectricty price (£/MWh)200<strong>Bio</strong>-<strong>SNG</strong> (p/therm)Electricity (£/MWh)Figure 6.9 Levelised cost of <strong>Bio</strong>-<strong>SNG</strong> supported by the RHI at £40/MWh and renewableelectricity supported by 2 ROCS as Advanced Gasification based on SRF with 60% biogeniccontent6.4 FINANCIAL CONCLUSIONSFrom this analysis, the following conclusions can be drawnA support mechanism such as the RHI is critical for <strong>Bio</strong>-<strong>SNG</strong> – without it, conversion of biomassinto <strong>Bio</strong>-<strong>SNG</strong> for the purpose of Grid injection will not happen at any scale using any fuel.With the current assumed support level under the RHI of £40/MWh, a <strong>Bio</strong>-<strong>SNG</strong> Project at50MWth will not be viable (on any of the fuels assessed). Either some form of capital grant orsubsidy enhancement is necessary for a small <strong>Bio</strong>-<strong>SNG</strong> Project to operate.However at 300MWth the current support level is sufficient to enable competitively costed bio-<strong>SNG</strong> project, particularly if fuelled fully or partially by a waste derived fuel. This indicates thatthere could be a long term role for <strong>Bio</strong>-<strong>SNG</strong> commercially.58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!