21.07.2015 Views

Bio-SNG - CNG Services

Bio-SNG - CNG Services

Bio-SNG - CNG Services

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECT9.4 REGIONAL FEEDSTOCKIn addition to ascertaining the availability of potential sites, it is also important to consider the availabilityof feedstock. Teesside does have a significant number of biomass and waste projects operating or slatedas shown in Table 9-2. These represent over 2.5Mte of biomass and 1.4Mte of waste. Clearly suchprojects demonstrate that Teesside does have both the transport infrastructure and access routes to bothtypes of resources. However, these resources are clearly sought after to support these projects. Themajority of this resource is for slated/in-development projects, not all of which will happen.Existing/in-build te pa Slated te pa<strong>Bio</strong>mass Wilton 10 300,000 MGT Power 1,500,000Lynemouthcofiringpotential~200,000 BEI 400,000Gaia Power 400,000Waste SITA, Haverton 390,000 Ineos <strong>Bio</strong> 100,000Haverton Ext 190,000Wilton 11 400,000Air Products 300,000Table 9-2Teesside: slated feedstock consumptions83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!