21.07.2015 Views

Bio-SNG - CNG Services

Bio-SNG - CNG Services

Bio-SNG - CNG Services

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BIO-<strong>SNG</strong> FEASIBILITY STUDY – ESTABLISHMENT OF A REGIONAL PROJECTAppendix 4The North East CCS ClusterThe proposed North East CCS Cluster is in the heartland of the UK‟s heavy process and chemicalindustries. Design and pre-FEED engineering has been undertaken for all elements of the CCS chain andkey arrangements put in place to support a project plan which aims for first operation before the end of2015.Captured CO 2 will be transported in a new pipeline for storage, and potential EOR, in an oil field in theCentral North Sea. The pipeline is routed to also allow storage in a saline aquifer with a CO 2 storagecapacity in excess of 1bte providing risk management to the storage element and allowing storage in alarge saline aquifer to be demonstrated. The offshore pipeline has been sized to accommodate additionalCO 2 from Teesside and the wider North East.Development work has been undertaken on two substantial anchor CO 2 capture sources either or both ofwhich could underpin the commercial development of the network, as well as provide demonstration ofpre-combustion capture at a scale of at least 400MWe. The facility at Teesside will be a new build syngasplant which generates decarbonised hydrogen from coal for conversion to power in a CCGT (ie operatingas an IGCC) as well as for use by Industry in the area. At Lynemouth, configuring the existing coal powerstation with pre-combustion capture provides demonstration of an IGCC retrofit with capture to an existingcoal power station. Each facility would capture in excess of 2.5million tonnes of CO 2 per annum.The region has numerous substantial emitters of carbon dioxide which will be able to link into the coreCO 2 infrastructure, either via capture from their existing facilities, or by the use of decarbonised feedstockand fuel. Specific existing industrial players are actively pursuing the decarbonisation options that CO 2infrastructure would offer. Furthermore the network will enable inward investment into the UK by otherhigh carbon emitters from around Europe for whom the unique storage opportunities afforded by theNorth Sea enables decarbonisation of their industry.Eston Grange IGCC, Teesside Offshore Infrastructure Lynemouth Power Plant96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!