BIBLIOGRAFÍA Articulos 1. Brief Overview of Gulf of Mexico OCS Oil and Gas Pip<strong>el</strong>ines: Instal<strong>la</strong>tion, Pot<strong>en</strong>tial Impacts, and Mitigation Measures, Deborah Cranswick, Minerals Managem<strong>en</strong>t Service, Gulf of Mexico OCS Region, New Orleans, August 2001. 2. Automatic Pigging of Two-Phase Gas Gathering Systems., D. J. Vinson, American Institute of Mining, Metallurgical, and Petroleum Engineers., Colorado interstate gas co., Colorado springs, colo., Feb. 19, 1968., SPE 2083. 3. Int<strong>el</strong>lig<strong>en</strong>t Pigging of the Ekofisk-Em<strong>de</strong>n 36-in. Gas Pip<strong>el</strong>ine, By G.A, Nespeca and K,B. Hveding, Phillips Petroleum CO. Norway, Huston, Texas. October 2, 1988, SPE members., SPE 18232. 4. Pigging Dynamics in Two-Phase Flow Pip<strong>el</strong>ines: Experim<strong>en</strong>t and Mo<strong>de</strong>ling, Kazuioshl Minaml, Petrobrds, and Ovadia Shoham, u. Of Tulsa, Huston, Texas. October 3, 1993., SPE 26568. 5. Pip<strong>el</strong>ine Integrity Managem<strong>en</strong>t Thmugh Int<strong>el</strong>lig<strong>en</strong>t Survey, By Ali A. Choumar, Adco, Abu Dhabi., SPE 36275. 142
BIBLIOGRAFÍA 6. Mo<strong>de</strong>lling of Transi<strong>en</strong>t Two-Phase Flow Operations and Offshore Pigging, P.C.R. Lima, SPE, Petrobras S.A., H. Yeung, Cranfi<strong>el</strong>d University, New Orleans, Louisiana, 27 September 1998., SPE 49208. 7. Bi-directional Int<strong>el</strong>ig<strong>en</strong>t Pigging of 48 inch Loading Line – Zadco Experi<strong>en</strong>ce, By Jamal al Amari & R. Radhakrishnan, Zadco, Abu Dhari, U.A.E. 11 October 1998., SPE 49508. 8. Mo<strong>de</strong>ling of Pigging Operations, P.C.R. lima, Petrobras S.A., and h. Yeung, Cranfi<strong>el</strong>d University, Houston, Texas, 3 October 1999., SPE 56586. 9. Chall<strong>en</strong>ges in Pigging of Subsea Gas Flowlines, Subash Jayawar<strong>de</strong>na, Leonid Dykhno and John Hudson, S<strong>el</strong>l Global Solutions US, San Antonio, Texas, 29 September 2002., Spe 7757. 10. Specifications and Requirem<strong>en</strong>ts for Int<strong>el</strong>lig<strong>en</strong>t Pig Inspection of Pip<strong>el</strong>ines Version 2.1, 6 November 98. 11. Transi<strong>en</strong>t Analysis of Point Argu<strong>el</strong>lo Gas Pip<strong>el</strong>ine Behavior, Sarica, C., Istanbul Technical U.; Shoham, O., Brill, J.P., U. Of Tulsa; Tait<strong>el</strong>, y., T<strong>el</strong> Aviv U., SPE Production Operations Symposium, Ok<strong>la</strong>homa City, Ok<strong>la</strong>homa, 7-9 April., SPE 21731. 12. Slug-Sizing/slug-Volume Prediction: State of the Art Review and Simu<strong>la</strong>tion, N.E. Burke, S.F. Kashou, Texaco Group Inc., SPE production & Facilities, Volume 11, Number 3, August, 166-172 pages., SPE 30902. 13. Recover Gas From Pip<strong>el</strong>ine Pigging Òperations, Pro Fact Sheet no. 507, Partner Reported Opportunities (Pros) for Reducing Methane Emissions. 14. User's Manual v4.0, Olga 2000, Scandpower Petroleum Technology, Kj<strong>el</strong>ler, Norway. 15. Recover Gas from Pip<strong>el</strong>ine Pigging Operations, Partner Reported Opportunities (PROs)for Reducing Methane Emissions, PRO Fact Sheet No. 507, October 2005. 16. Decommissioning and Removal, Of Oil and Gas Facilities, Offshore California: Rec<strong>en</strong>t Experi<strong>en</strong>ces and Future, Deepwater Chall<strong>en</strong>ges, V<strong>en</strong>tura, California September 23-25, 1997. 17. Construction Standard Specification, Section 02553, Exterior Gas Piping Systems, October 15, 2001. 143