Economic Diversification and Growth
71mK301zeG0
71mK301zeG0
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter 2<br />
Table 2.3: Mineralization, Reserves <strong>and</strong> Project Status<br />
No Minerals Status of Reserves Project Status<br />
1. Copper 6 million tons at 1.77% Cu.<br />
Grade of 1.7% at Boboong. Reserves at Kitaka <strong>and</strong> Kampono under evaluation.<br />
Leased to Tibet Hima to develop copper resources at Kilembe Mines.<br />
Reserves at Kitaka <strong>and</strong> Kampono under exploration<br />
2. Cobalt 5.5 million Tons with Grade of 0.17 of cobalt. Kasese cobalt company Limited has been processing cobalt stockpile,<br />
which is nearly exhausted<br />
3. Gold Five (5) million ounces of gold in Mubende District by Anglo Ug<strong>and</strong>a Corporation; One (1) million ounces Four (4) Mining Leases Granted<br />
of gold estimated at Mashonga; 500,000 ounces of gold estimated at Tiira, Busia; <strong>and</strong> Over 500,000<br />
ounces estimated at Alupe in Busia; 139,000 ounces <strong>and</strong> possible reserves of 160,000 of gold at Nakabat<br />
in Moroto District.<br />
4. Iron Ore 50 million tons at Muko, Kabale; 2 million tons in Mugabuzi, Mbarara; 23 million tons at bukusu <strong>and</strong><br />
45 million tons at Sukulu, Tororo District; 48 million tons at Buhara in Kabale District (New discovery); 8<br />
million tons in Bufumbira, Kisoro (New Discovery); 55 million tons at Butogota in Kanungu District (New<br />
Discovery).<br />
Four (4) Mining Leases granted for development of iron ore resources.<br />
5 Columbite<br />
Tantalite<br />
130 million tons of Niobium at Sikulu.<br />
3.5 million tons of Columbite –tantalite estimated at Kagango in Ntungamo District.<br />
6 Tin 1 million tons at 2.5% tin estimated in Ntungamo.<br />
2.5 million tons in Isingiro District<br />
The Sukulu Phosphate deposit is potentially the most important<br />
source of Niobium.<br />
Under-developed<br />
Two Mining Leases granted.<br />
7 Titanium Grade of titanium is 22% TiO2 <strong>and</strong> 13% TiO2 in Bukusu <strong>and</strong> Sukuru respectively. Underdeveloped.<br />
8 Tungsten Kirwa wolfram resources estimated at 801,300 Metric Tons of average grade of 68.67% WO3<br />
Three Mining Leases granted.<br />
One (1) million tons <strong>and</strong> possible reserves of 355 million tons at Nyamuliro with ore grade at 0.1%<br />
9 Rare Earth<br />
Elements (REE)<br />
73.6 million tons of rare earth elements at Sukulu with grade of 0.32% La205. Aluminous clays that are<br />
enriched in Sc<strong>and</strong>ium, Gallium, Yttrium <strong>and</strong> REE in Makuutu area estimated at 3 billion tons.<br />
With grades of 23% REE <strong>and</strong> 27% Alumina.<br />
Unexplored, though Sukulu is now under exploration.<br />
10 Phosphates 230 million tons at Sukulu with grade of 13.1% p2o5.<br />
50 million tons at Bukusu with grade of 12.8% p2o5<br />
11 Limestone/Mable 14.5 million tons at Hima Kasese <strong>and</strong> 11.6 million tons at Dura, Kamwenge.<br />
Over 300 million tons of marble in Karamoja region.<br />
Investment in fertilizer manufacturing is viable.<br />
Apatite with magnetite, vermiculite, pyrochlore, bbarite, zircom,<br />
uranium, titanium, Niobium <strong>and</strong> rare earth elements.<br />
Production on large scale in Kasese, Tororo <strong>and</strong> Moroto.<br />
12 Vermiculite 54.9 million tons at Namekhara. Mine developed at Namekhara<br />
Investment in fertilizer manufacturing plant viable.<br />
13 Kaolin 2.8 million tons at mutaka, Bushenyi District.<br />
Ready domestic market.<br />
One million tons at Kisai (koki), Rakai District.<br />
14 Gypsum 2 million tons in Kibuku. Available Market<br />
15 Salt 22 million tons of trona at Katwe <strong>and</strong> Kasenyi, Kasese District. Mined for both animal <strong>and</strong> human consumption.<br />
Industrial production opportunities available.<br />
16 Glass S<strong>and</strong> The highest quality 99.9% SiO2 at Kome Isl<strong>and</strong>s, 2 million tons at Dimu <strong>and</strong> Bukakata (99.93% SiO2) Viable Investment<br />
17 Dimension Stones Over 300 million tons of marble in Karamoja (Rupa, Kosiroi, Tank Hill, Forest Reserve, Matheniko, Oule <strong>and</strong><br />
Lolung).<br />
Source: MEMD (2014).<br />
A Mining Lease granted for building majesties (u) Ltd (BML) to process<br />
granites in Mubende into dimension stone.<br />
38<br />
Ug<strong>and</strong>a Country <strong>Economic</strong> Memor<strong>and</strong>um: <strong>Economic</strong> <strong>Diversification</strong> <strong>and</strong> <strong>Growth</strong> in the Era of Oil <strong>and</strong> Volatility