10<br />

Performance (cont.)<br />

Ausgrid met average reliability standards<br />

in each feeder category in 2014/15. During<br />

this period, 61 distribution feeders exceeded<br />

their feeder category thresholds and<br />

required investigation. All actions required<br />

as a result of these investigations were met<br />

in the relevant timeframes.<br />

A number of targeted projects were<br />

completed during the year to improve<br />

reliability for identified customers.<br />

These projects had a total value of<br />

$2.3 million and included the installation<br />

of seven reclosers and 13 remote<br />

controlled switches. The reclosers and<br />

control switches reduce the number of<br />

customers experiencing sustained outages<br />

and shorten the time taken to locate<br />

network faults. Ausgrid also replaced<br />

bare overhead conductors with covered<br />

conductors in some heavily vegetated areas<br />

to reduce the number of interruptions<br />

caused by trees and other vegetation.<br />

Improving customer service<br />

In 2014/15, we focussed on enhancing<br />

our customers’ experience. These efforts<br />

were supported by a new Customer<br />

Commitment Statement introduced in<br />

April 2015, outlining what customers<br />

could expect from the organisation.<br />

Ausgrid's Customer Satisfaction Index result<br />

for 2014/15 was 78.7 percent, lower than<br />

the target of 80 percent but an improvement<br />

of 1.3 percent on the 2013/14 result.<br />

Other opportunities to enhance Ausgrid’s<br />

customer service were identified, including<br />

partnering with retailers to provide<br />

better outcomes for customers. A range<br />

of self‐service reporting forms were also<br />

implemented on Ausgrid’s website and<br />

mobile website.<br />

Throughout the year, Ausgrid had seven<br />

immediately reportable breaches of the<br />

National Energy Customer Framework<br />

(NECF), where we failed to provide the<br />

required advance notice to registered life<br />

support customers about planned power<br />

outages. The importance of notifying<br />

registered life support customers is<br />

recognised and letters were sent to about<br />

20,000 of these vulnerable households<br />

in mid‐2015, providing information and<br />

contact details.<br />

Deliver the network plan<br />

Network investment<br />

Ausgrid is committed to delivering a safe,<br />

reliable and affordable electricity supply.<br />

Under reforms commenced by the NSW<br />

Government in 2012, we are working<br />

to make the network more efficient<br />

and reduce expenditure to help put<br />

downward pressure on consumer prices.<br />

In 2014/15 Ausgrid invested $579 million in<br />

our electricity network – almost 45 percent<br />

less than the approved capital expenditure<br />

of $1,008 million. This reduction was the<br />

result of significant changes to investment<br />

governance. This investment included a focus<br />

on lower cost delivery models, and a review<br />

of approval conditions which led to a number<br />

of projects being cancelled and/or deferred.<br />

The expected continuing decline in electricity<br />

consumption has allowed risk factors for<br />

current asset conditions to be reassessed.<br />

Capital investment during 2014/15 included<br />

$211 million for major substation and feeder<br />

projects, including new substations brought<br />

into service at Rose Bay and Waverley.<br />

Major refurbishments were completed<br />

at St Peters and Bunnerong North, along<br />

with sub‐transmission feeder projects at<br />

North Sydney, Belmore Park and Engadine.<br />

More than 543 kilometres of high and low<br />

voltage cables were commissioned during<br />

2014/15 and work continued on 67 major<br />

projects, including new sub‐transmission<br />

feeders from Mason Park to Rozelle, Lindfield<br />

to Willoughby, and Lindfield to Castle Cove,<br />

and zone substations at Olympic Park,<br />

Engadine, Metford and Tighes Hill.<br />

Detailed design and development<br />

commenced on seven major projects<br />

and construction was approved<br />

for seven substation upgrades and<br />

sub‐transmission feeder projects, including<br />

new sub‐transmission substations<br />

at Munmorah and Alexandria.<br />

In addition to this capital expenditure,<br />

390,809 planned maintenance tasks<br />

and checks were completed across the<br />

network, involving operational expenditure<br />

of more than $295 million. This includes<br />

underground and overhead line inspections,<br />

pole inspections and treatments, bushfire<br />

patrols and substation inspections.<br />

System average interruption<br />

frequency index (SAIFI)<br />

10/11<br />

10/11<br />

11/12<br />

13/14<br />

1.09<br />

11/12<br />

13/14<br />

14/15<br />

98*<br />

14/15<br />

12/13<br />

0.82<br />

0.91*<br />

12/13<br />

77<br />

82*<br />

0.69<br />

0.73<br />

*Historical figures differ from prior<br />

annual reports due to data improvements<br />

across all years.<br />

Average customer minutes<br />

without supply<br />

71<br />

68<br />

*Historical figures differ from prior<br />

annual reports due to data improvements<br />

across all years.