ORION Commercial 'LULA' Elevator - Advanced Lift Solutions
ORION Commercial 'LULA' Elevator - Advanced Lift Solutions
ORION Commercial 'LULA' Elevator - Advanced Lift Solutions
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1.3 TOOLS AND MATERIALS REQUIRED<br />
o Allen Wrenches (Keys) (⅛" - ⅜" Imperial)<br />
o Allen Wrenches (Keys) (Metric)<br />
o Screwdrivers (Slotted and Phillips)<br />
o Set of Mechanical Sockets and Wrenches (¼" - 1 ¼" Imperial Sizes)<br />
o 4 foot (1219 mm) Carpenter’s Level and Square<br />
o ⅜" Reversible Hand Drill (Variable Speed)<br />
o Carbide Drill Bits, ⅜" (10 mm) and ½" (13 mm)<br />
o ½" Hammer Drill (for concrete fasteners)<br />
o Pry Bar<br />
o Chain Hoist (required for higher travel units), minimum ½ ton capacity<br />
o Hand Dolly<br />
o Temporary Run Buttons (refer to Appendix B Parts List)<br />
o Scratch Point Awl<br />
o Plumb Bob and Line<br />
o Chalk Line<br />
o Tape Measure<br />
o Wire Tie Wraps<br />
o Wire Puller (50 feet of ⅛" fish tape)<br />
o Volt-Ohm Meter (V.O.M.)<br />
o Stop Watch or Tachometer (to set final speed)<br />
o Funnel (for filling the oil reservoir)<br />
o Vise-Grip Pliers (standard and wide jaw welder’s type)<br />
o Rags and Cleaning Solvent<br />
o 100 foot (30 m) Extension Cord (Minimum 14 gauge wire)<br />
o 10" (250 mm) (Medium Cut) File (for filing joints, if required)<br />
o Scaffolding or ladders and planks for erection of rails and brackets<br />
o Wire Strippers<br />
o Temporary Light for hoistway<br />
o ½" Rope, minimum length to be as long as the hoistway height<br />
o Rubber Mallet<br />
o Speedy Jig (refer to Appendix B Parts List)<br />
o 2 Strap Wrenches for Split Cylinders<br />
o <strong>Lift</strong>ing Sling (Cable or Nylon Strap of Adequate Strength)<br />
o Coated Steel Shims, minimum 4" (100 mm) square<br />
o Wall Anchors<br />
o 10 Gauge and 14 Gauge Wire for motor and light wiring<br />
o Assorted Butt Electrical Wire Connectors and Crimping Tool<br />
o 32 Grade Hydraulic Oil, maximum 20 gallon (will vary depending on travel)<br />
o ½" Electrical Box Connectors<br />
o Hoistway Wiring Materials (varies depending on local codes), 20 gauge stranded<br />
multi-wire cable with 20-28 conductors for connecting the pump controller to the<br />
travelling cable at the halfway box.<br />
Orion Installation Guide<br />
PN 000581 (18-m06-2010)<br />
9 of 145<br />
o r i o n co m m e r c i a l ‘l u l a’ e l e vato r