8) Scribe a centre line on the back<br />

of each rail using a T-square and<br />

scribe as shown in Figure 11.<br />

This line will be used to align the<br />

rail with the leaf brackets using<br />

the diamond cut-out on the leaf<br />

bracket.<br />

9) (OPTION) At this point preassemble<br />

the rail brackets and<br />

leaf brackets OR complete this<br />

step after the rail brackets are<br />

installed (step 11) using the<br />

hardware provided. Assemble<br />

figure 11<br />

the adjustable leaf brackets<br />

making sure that the brackets are pushed back fully as shown in Figure 12 and 13.<br />

DO NOT install the rail bracket clips as they will interfere with the use of the rail alignment<br />

jig.<br />

10) Refer to the installation drawing<br />

to install the splice plates to the<br />

top of each rail section using 4<br />

of the splice plate bolts, flats,<br />

locks and nuts provided. Bolts<br />

need to be snug only as they will<br />

be tightened up in the hoistway.<br />

CAUTION: Remember that you<br />

will be installing one rail “male”<br />

side up and the other “female”<br />

side up. See step 19.<br />

Orion Installation Guide<br />

PN 000581 (18-m06-2010)<br />

Adjust Leaf Brackets as shown<br />

figure 12 Rail Bracket Installed<br />

Rail wall Side<br />

figure 13 Rail Bracket and Leaf Bracket Assembled<br />

21 of 145<br />

o r i o n co m m e r c i a l ‘l u l a’ e l e vato r