Orion Installation Guide<br />

PN 000581 (18-m06-2010)<br />

LOCAL CODES AND REGULATIONS MAY REQUIRE A<br />

LICENSED ELECTRICIAN TO CONNECT TO THE MAINS.<br />

CHECK wITH YOUR LOCAL AUTHORITY BEfORE<br />

BEGINNING THE INSTALLATION.<br />

Direct the electrician to the proper installation location for the following:<br />

1) A fused, lockable, disconnect switch with the proper amperage and voltage supply, as<br />

detailed on the Pump Unit Data Plate or the supplied job specific Installation Drawings.<br />

The disconnect must be fused.<br />

2) A fused, lockable, disconnect switch or breaker for the cab lighting supply. The disconnect<br />

must be fused.<br />

3) A pit light, switch and receptacle. (Optional but may be required by local code.)<br />

NOTE<br />

Before starting the rail installation, it is important to clean the rail sections first. If they<br />

are shipped with a protective waxlike coating to prevent rusting, this protective coating<br />

must be removed. Once the rails are cleaned, check for any burrs or nicks and file as<br />

required. Apply lithium grease to rails when the installation is completed.<br />

17 of 145<br />