3-phase TEFV induction motors ATEX GAS - Zones 1 & 2
3-phase TEFV induction motors ATEX GAS - Zones 1 & 2
3-phase TEFV induction motors ATEX GAS - Zones 1 & 2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
LEROY-SOMER's quality management<br />
system is based on:<br />
- Control of procedures right from the initial<br />
sales offering until delivery to the customer,<br />
including design, manufacturing start-up and<br />
production<br />
- A total quality policy based on making<br />
continuous progress in improving operational<br />
procedures, involving all departments in<br />
the company in order to give customer<br />
LEROY-SOMER has entrusted the<br />
certification of its expertise to various<br />
international organisations.<br />
Certification is granted by independent<br />
professional auditors, and recognises the<br />
high standards of the company's quality<br />
assurance procedures.<br />
All activities resulting in the final version<br />
of the machine have therefore received<br />
official certification ISO 9001: 2000 from<br />
the DNV.<br />
Similarly, our environmental approach<br />
has enabled us to obtain certification ISO<br />
14001: 2004.<br />
Products for particular applications or<br />
those designed to operate in specific<br />
environments are also approved or<br />
certified by the following organisations:<br />
INERIS, LCIE, DNV, BSRIA, TUV, CCC,<br />
GOST, which check their technical<br />
performance against the various standards<br />
or recommendations.<br />
CERTIFICATION<br />
The <strong>ATEX</strong> <strong>motors</strong> presented in this catalogue<br />
comply with the national and/or international<br />
standards governing the construction of this<br />
type of equipment.<br />
EC type-examination certificates are drawn<br />
up by notified bodies, in accordance with the<br />
European Community Council Directive<br />
94/9/EC known as <strong>ATEX</strong>.<br />
Approval is obtained when descriptive<br />
documents have been examined and<br />
validated, and tests performed. These include<br />
tests involving heating and explosion of the<br />
equipment.<br />
EC-type examination certificates granted by<br />
the bodies listed opposite are recognized by<br />
all EC countries.<br />
Approved equipment is authorized to carry<br />
the CE mark or the distinctive community<br />
mark<br />
3-<strong>phase</strong> <strong>TEFV</strong> <strong>induction</strong> <strong>motors</strong><br />
<strong>ATEX</strong> <strong>GAS</strong> - <strong>Zones</strong> 1 & 2<br />
General information<br />
A1 - Quality assurance<br />
satisfaction as regards delivery times,<br />
conformity and cost<br />
- Indicators used to monitor procedure<br />
performance.<br />
- Corrective actions and advancements<br />
with tools such as FMECA, QFD, MAVP,<br />
MSP/MSQ and Hoshin type improvement<br />
workshops on flows, process re-engineering,<br />
plus Lean Manufacturing and Lean Office.<br />
- Annual surveys, opinion polls and regular<br />
visits to customers in order to ascertain and<br />
detect their expectations.<br />
Personnel are trained and take part in the<br />
analyses and actions for continuously<br />
improving the procedures.<br />
ISO 9001 : 2000<br />
9