11.12.2012 Views

3-phase TEFV induction motors ATEX GAS - Zones 1 & 2

3-phase TEFV induction motors ATEX GAS - Zones 1 & 2

3-phase TEFV induction motors ATEX GAS - Zones 1 & 2

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEROY-SOMER's quality management<br />

system is based on:<br />

- Control of procedures right from the initial<br />

sales offering until delivery to the customer,<br />

including design, manufacturing start-up and<br />

production<br />

- A total quality policy based on making<br />

continuous progress in improving operational<br />

procedures, involving all departments in<br />

the company in order to give customer<br />

LEROY-SOMER has entrusted the<br />

certification of its expertise to various<br />

international organisations.<br />

Certification is granted by independent<br />

professional auditors, and recognises the<br />

high standards of the company's quality<br />

assurance procedures.<br />

All activities resulting in the final version<br />

of the machine have therefore received<br />

official certification ISO 9001: 2000 from<br />

the DNV.<br />

Similarly, our environmental approach<br />

has enabled us to obtain certification ISO<br />

14001: 2004.<br />

Products for particular applications or<br />

those designed to operate in specific<br />

environments are also approved or<br />

certified by the following organisations:<br />

INERIS, LCIE, DNV, BSRIA, TUV, CCC,<br />

GOST, which check their technical<br />

performance against the various standards<br />

or recommendations.<br />

CERTIFICATION<br />

The <strong>ATEX</strong> <strong>motors</strong> presented in this catalogue<br />

comply with the national and/or international<br />

standards governing the construction of this<br />

type of equipment.<br />

EC type-examination certificates are drawn<br />

up by notified bodies, in accordance with the<br />

European Community Council Directive<br />

94/9/EC known as <strong>ATEX</strong>.<br />

Approval is obtained when descriptive<br />

documents have been examined and<br />

validated, and tests performed. These include<br />

tests involving heating and explosion of the<br />

equipment.<br />

EC-type examination certificates granted by<br />

the bodies listed opposite are recognized by<br />

all EC countries.<br />

Approved equipment is authorized to carry<br />

the CE mark or the distinctive community<br />

mark<br />

3-<strong>phase</strong> <strong>TEFV</strong> <strong>induction</strong> <strong>motors</strong><br />

<strong>ATEX</strong> <strong>GAS</strong> - <strong>Zones</strong> 1 & 2<br />

General information<br />

A1 - Quality assurance<br />

satisfaction as regards delivery times,<br />

conformity and cost<br />

- Indicators used to monitor procedure<br />

performance.<br />

- Corrective actions and advancements<br />

with tools such as FMECA, QFD, MAVP,<br />

MSP/MSQ and Hoshin type improvement<br />

workshops on flows, process re-engineering,<br />

plus Lean Manufacturing and Lean Office.<br />

- Annual surveys, opinion polls and regular<br />

visits to customers in order to ascertain and<br />

detect their expectations.<br />

Personnel are trained and take part in the<br />

analyses and actions for continuously<br />

improving the procedures.<br />

ISO 9001 : 2000<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!