OPERATING AND EXPLORATION REVIEw<br />

Dr Mike Watts, Exploration & New Bus<strong>in</strong>ess Director<br />

Phil Tracy, Eng<strong>in</strong>eer<strong>in</strong>g & Operations Director<br />

25% <strong>in</strong>crease<br />

In manGala planned plateau<br />

prOduCtIOn tarGet tO 125,000 bOpd<br />

40,000 bopd<br />

peak prOduCtIOn In bhaGyam fdp<br />

eor Pilot<br />

start up In 2009<br />

14 CAIRN ENERGY <strong>PLC</strong> ANNUAL REPORT <strong>2007</strong><br />

GOOD PROGRESS IS BEING mADE ON THE CIVIL<br />

wORkS AND PROCESS FACILITIES CONSTRUCTION<br />

CONTRACTS which have been awarded for the<br />

rajasthan upstream project. all access roads<br />

to the four hundred acre site have been built<br />

and work on the civil works on the mangala<br />

term<strong>in</strong>al has started.<br />

rajasthan<br />

(block rj-On-90/1) (<strong>Cairn</strong> India 70%<br />

(Operator), OnGC 30%)<br />

development – upstream<br />

good progress is be<strong>in</strong>g made on the civil<br />

works and process facilities construction<br />

contracts which have been awarded for<br />

the rajasthan upstream project. all<br />

access roads to the 400-acre site have<br />

been built and work on the civil works<br />

on the mangala term<strong>in</strong>al has started.<br />

mangala will be brought on stream <strong>in</strong><br />

phases with production commenc<strong>in</strong>g <strong>in</strong><br />

h2 2009. the transportation of the crude<br />

will be via pipel<strong>in</strong>e to the coast for which<br />

the feed are complete. the long lead<br />

procurement process is under way and<br />

construction is due to commence <strong>in</strong><br />

h2 2008.<br />

the construction of two purpose-built<br />

rigs which will be used to drill the<br />

development wells is near<strong>in</strong>g completion<br />

and these rigs will be available <strong>in</strong> <strong>in</strong>dia <strong>in</strong><br />

the second half of the year.<br />

these state-of-the-art rigs will allow the<br />

drill<strong>in</strong>g and complet<strong>in</strong>g of the mangala<br />

wells (some of which will be horizontal),<br />

which cairn <strong>in</strong>dia <strong>in</strong>tends to use to<br />

deliver the first phase of production<br />

from the rajasthan fields.<br />

a 120 km 2 high def<strong>in</strong>ition 3d seismic<br />

survey was completed over the mangala<br />

field and process<strong>in</strong>g of the data is<br />

expected to be complete dur<strong>in</strong>g 2008.<br />

this data will be used for more detailed<br />

reservoir characterisation for<br />

development drill<strong>in</strong>g and for the<br />

application of future time lapse<br />

monitor<strong>in</strong>g techniques.<br />

an upgrade of the mangala stoiip<br />

and reserves and resources has been<br />

submitted to the jv partners and the<br />

goi. the <strong>in</strong>crease <strong>in</strong> the 2p stoiip and 2p<br />

reserves and resources is 21% and 29%<br />

respectively over the orig<strong>in</strong>al fdp. this<br />

represents an <strong>in</strong>crease of 8% and 11%<br />

over the figures provided at the time of<br />

the ipo of the <strong>in</strong>dian bus<strong>in</strong>ess.<br />

Gross stOIIp 2p Gross reserves/ 2p net reserves/<br />

2C resources resources<br />

(mmboe) <strong>Cairn</strong> d&m <strong>Cairn</strong> d&m <strong>Cairn</strong> d&m<br />

rajasthan mba fields<br />

rajasthan mba eor<br />

rj small fields: saraswati<br />

2,054 2,118<br />

685<br />

308<br />

701<br />

308<br />

479<br />

216<br />

491<br />

216<br />

& raageshwari oil/gas 300 144 12 39 9 27<br />

rj other fields 1,397 1,216 72 54 51 38<br />

Total 3,751 3,478 1,077 1,102 755 772<br />

notes:<br />

1. cairn holds a 70% net work<strong>in</strong>g <strong>in</strong>terest <strong>in</strong> rj-on-90/1.<br />

2. the gross proven plus probable and possible (3p) <strong>in</strong>itially <strong>in</strong> place cairn estimate for mangala<br />

is approximately 1,600 mmboe <strong>in</strong>dicat<strong>in</strong>g the potential for further volumetric upside.<br />

3. 2p reserves <strong>in</strong>clude estimates of expected production dur<strong>in</strong>g the current production shar<strong>in</strong>g<br />

contract (psc) term (14 may 2020 for rajasthan). 2c resources are those volumes expected to<br />

be produced outside the current psc term (end of field life) or where development plann<strong>in</strong>g or<br />

approval is pend<strong>in</strong>g.<br />

4. these are current estimates which have not been booked. for booked net entitlement reserves<br />

please see the entitlement reserves section on page 129.