OPERATING AND EXPLORATION REVIEw<br />
Dr Mike Watts, Exploration & New Bus<strong>in</strong>ess Director<br />
Phil Tracy, Eng<strong>in</strong>eer<strong>in</strong>g & Operations Director<br />
25% <strong>in</strong>crease<br />
In manGala planned plateau<br />
prOduCtIOn tarGet tO 125,000 bOpd<br />
40,000 bopd<br />
peak prOduCtIOn In bhaGyam fdp<br />
eor Pilot<br />
start up In 2009<br />
14 CAIRN ENERGY <strong>PLC</strong> ANNUAL REPORT <strong>2007</strong><br />
GOOD PROGRESS IS BEING mADE ON THE CIVIL<br />
wORkS AND PROCESS FACILITIES CONSTRUCTION<br />
CONTRACTS which have been awarded for the<br />
rajasthan upstream project. all access roads<br />
to the four hundred acre site have been built<br />
and work on the civil works on the mangala<br />
term<strong>in</strong>al has started.<br />
rajasthan<br />
(block rj-On-90/1) (<strong>Cairn</strong> India 70%<br />
(Operator), OnGC 30%)<br />
development – upstream<br />
good progress is be<strong>in</strong>g made on the civil<br />
works and process facilities construction<br />
contracts which have been awarded for<br />
the rajasthan upstream project. all<br />
access roads to the 400-acre site have<br />
been built and work on the civil works<br />
on the mangala term<strong>in</strong>al has started.<br />
mangala will be brought on stream <strong>in</strong><br />
phases with production commenc<strong>in</strong>g <strong>in</strong><br />
h2 2009. the transportation of the crude<br />
will be via pipel<strong>in</strong>e to the coast for which<br />
the feed are complete. the long lead<br />
procurement process is under way and<br />
construction is due to commence <strong>in</strong><br />
h2 2008.<br />
the construction of two purpose-built<br />
rigs which will be used to drill the<br />
development wells is near<strong>in</strong>g completion<br />
and these rigs will be available <strong>in</strong> <strong>in</strong>dia <strong>in</strong><br />
the second half of the year.<br />
these state-of-the-art rigs will allow the<br />
drill<strong>in</strong>g and complet<strong>in</strong>g of the mangala<br />
wells (some of which will be horizontal),<br />
which cairn <strong>in</strong>dia <strong>in</strong>tends to use to<br />
deliver the first phase of production<br />
from the rajasthan fields.<br />
a 120 km 2 high def<strong>in</strong>ition 3d seismic<br />
survey was completed over the mangala<br />
field and process<strong>in</strong>g of the data is<br />
expected to be complete dur<strong>in</strong>g 2008.<br />
this data will be used for more detailed<br />
reservoir characterisation for<br />
development drill<strong>in</strong>g and for the<br />
application of future time lapse<br />
monitor<strong>in</strong>g techniques.<br />
an upgrade of the mangala stoiip<br />
and reserves and resources has been<br />
submitted to the jv partners and the<br />
goi. the <strong>in</strong>crease <strong>in</strong> the 2p stoiip and 2p<br />
reserves and resources is 21% and 29%<br />
respectively over the orig<strong>in</strong>al fdp. this<br />
represents an <strong>in</strong>crease of 8% and 11%<br />
over the figures provided at the time of<br />
the ipo of the <strong>in</strong>dian bus<strong>in</strong>ess.<br />
Gross stOIIp 2p Gross reserves/ 2p net reserves/<br />
2C resources resources<br />
(mmboe) <strong>Cairn</strong> d&m <strong>Cairn</strong> d&m <strong>Cairn</strong> d&m<br />
rajasthan mba fields<br />
rajasthan mba eor<br />
rj small fields: saraswati<br />
2,054 2,118<br />
685<br />
308<br />
701<br />
308<br />
479<br />
216<br />
491<br />
216<br />
& raageshwari oil/gas 300 144 12 39 9 27<br />
rj other fields 1,397 1,216 72 54 51 38<br />
Total 3,751 3,478 1,077 1,102 755 772<br />
notes:<br />
1. cairn holds a 70% net work<strong>in</strong>g <strong>in</strong>terest <strong>in</strong> rj-on-90/1.<br />
2. the gross proven plus probable and possible (3p) <strong>in</strong>itially <strong>in</strong> place cairn estimate for mangala<br />
is approximately 1,600 mmboe <strong>in</strong>dicat<strong>in</strong>g the potential for further volumetric upside.<br />
3. 2p reserves <strong>in</strong>clude estimates of expected production dur<strong>in</strong>g the current production shar<strong>in</strong>g<br />
contract (psc) term (14 may 2020 for rajasthan). 2c resources are those volumes expected to<br />
be produced outside the current psc term (end of field life) or where development plann<strong>in</strong>g or<br />
approval is pend<strong>in</strong>g.<br />
4. these are current estimates which have not been booked. for booked net entitlement reserves<br />
please see the entitlement reserves section on page 129.