Annual Report 2007 in PDF - Cairn Energy PLC
Annual Report 2007 in PDF - Cairn Energy PLC
Annual Report 2007 in PDF - Cairn Energy PLC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
nePal<br />
the security situation <strong>in</strong> nepal cont<strong>in</strong>ues<br />
to be monitored closely. contractual<br />
force majeure rema<strong>in</strong>s <strong>in</strong> place <strong>in</strong><br />
capricorn’s acreage <strong>in</strong> nepal preclud<strong>in</strong>g<br />
new seismic acquisition. as soon as the<br />
security situation permits, f<strong>in</strong>al plann<strong>in</strong>g<br />
for seismic field operations will<br />
recommence.<br />
tUnisia<br />
the key objective of the plectrum and<br />
medoil acquisitions was to acquire a<br />
material acreage position <strong>in</strong> tunisia and<br />
capricorn now has a 50% <strong>in</strong>terest <strong>in</strong> the<br />
nabeul permit and a 100% <strong>in</strong>terest <strong>in</strong> the<br />
louza permit, both of which are<br />
operated by capricorn and are located<br />
offshore of tunisia. it is currently planned<br />
to drill two to four exploration wells <strong>in</strong><br />
tunisia between q4 2008 and q4 2009<br />
with first activity commenc<strong>in</strong>g on the<br />
louza permit.<br />
other assets<br />
seismic surveys are be<strong>in</strong>g planned for<br />
offshore blocks <strong>in</strong> albania and peru for<br />
2008/09. licence applications have<br />
been made <strong>in</strong> sicily and spa<strong>in</strong>. blocks <strong>in</strong><br />
the bremer bas<strong>in</strong> (australia) and west<br />
of the shetlands are considered<br />
non-core assets.<br />
talisman, the operator for block prl-1 <strong>in</strong><br />
papua new gu<strong>in</strong>ea, is seek<strong>in</strong>g a licence<br />
extension and, if that is granted by the<br />
government, is plann<strong>in</strong>g to acquire a<br />
3d seismic survey <strong>in</strong> 2009 over the<br />
pandora gas field and other prospects.<br />
Qaqortoq, Greenland<br />
Cambay Bas<strong>in</strong>, India<br />
CAIRN ENERGY <strong>PLC</strong> ANNUAL REPORT <strong>2007</strong> 21